room and pillar system
简明释义
房柱法
英英释义
A mining method where rooms are excavated in a grid pattern, leaving pillars of untouched material to support the roof. | 一种采矿方法,在网格模式下开凿房间,同时留下未开采的支柱以支撑顶部。 |
例句
1.The coal mine employs a room and pillar system for efficient extraction.
这座煤矿采用房柱系统进行高效开采。
2.Many underground mines utilize the room and pillar system due to its stability.
许多地下矿山由于其稳定性而采用房柱系统。
3.The design of the room and pillar system minimizes ground subsidence.
房柱系统的设计最小化了地面下沉。
4.The safety of miners is enhanced by using the room and pillar system.
使用房柱系统可以提高矿工的安全性。
5.In the room and pillar system, large blocks of material are left to support the structure.
在房柱系统中,大块材料被留作支撑结构。
作文
The mining industry has long been a crucial part of our economy, providing essential resources for various sectors. One of the most traditional methods used in underground mining is the room and pillar system, which has been employed for centuries to extract minerals efficiently while ensuring the safety of miners. This method involves creating a series of rooms or chambers in the mined area, leaving behind pillars of untouched material to support the roof. The room and pillar system is particularly effective for flat-lying deposits, such as coal and certain types of ore, where the mineral is distributed evenly across a horizontal plane.The design of the room and pillar system allows for a balance between resource extraction and structural integrity. Miners excavate large sections of the mineral deposit, creating rooms that can be several meters wide and tall. The pillars, which are typically left at regular intervals, act as a support system to prevent collapses. This method minimizes the risk of cave-ins, which can be a significant hazard in underground mining operations.One of the advantages of the room and pillar system is its adaptability. It can be modified to suit different geological conditions and mining requirements. For instance, the size of the rooms and pillars can be adjusted based on the type of material being mined and the stability of the surrounding rock. Additionally, this system allows for partial recovery of the mineral, meaning that some of the resource remains in place to support the mine's structure, which can be advantageous in the long term.However, the room and pillar system is not without its challenges. One major concern is the potential for subsidence, which occurs when the ground above the mined area sinks due to the removal of material below. This can lead to environmental issues and damage to surface structures. To mitigate these risks, careful planning and monitoring are essential during the mining process. Advances in technology, such as remote sensing and geophysical surveys, have improved our ability to predict and manage subsidence effectively.Moreover, the room and pillar system can also impact the efficiency of mineral recovery. While it allows for safe mining practices, it may not always yield the highest percentage of the resource. In some cases, alternative mining methods, such as longwall mining, may be more efficient for extracting larger volumes of material. Therefore, mining companies must weigh the benefits of safety and stability against the potential for maximizing resource recovery.In conclusion, the room and pillar system remains a vital technique in the mining industry, balancing safety with efficiency. Its historical significance and ongoing relevance highlight the importance of traditional mining methods in an ever-evolving field. As we continue to explore and innovate within the industry, understanding systems like the room and pillar system will be crucial for sustainable and responsible resource extraction. By embracing both traditional and modern practices, we can ensure that mining operations are safe, efficient, and environmentally conscious, paving the way for a sustainable future in resource management.
采矿业长期以来一直是我们经济中至关重要的一部分,为各个行业提供必需的资源。地下采矿中使用的最传统方法之一是房间和支柱系统,这种方法已经被采用了几个世纪,以有效地提取矿物,同时确保矿工的安全。该方法涉及在开采区域内创建一系列房间或室,留下未开采的支柱以支撑顶部。房间和支柱系统对于如煤炭和某些类型矿石等平卧矿床特别有效,因为这些矿物均匀分布在水平面上。房间和支柱系统的设计允许在资源开采和结构完整性之间取得平衡。矿工挖掘矿藏的大块区域,创建可以达到几米宽和高的房间。支柱通常在定期间隔处保留,作为支撑系统以防止屋顶坍塌。这种方法最大限度地减少了矿井作业中的坍塌风险,这是一个重大危险。房间和支柱系统的一个优点是它的适应性。它可以根据不同的地质条件和采矿要求进行修改。例如,房间和支柱的大小可以根据所开采材料的类型和周围岩石的稳定性进行调整。此外,该系统允许部分回收矿物,这意味着一些资源留在原位以支撑矿井的结构,这在长期内可能是有利的。然而,房间和支柱系统并非没有挑战。一个主要问题是沉降的潜在性,当上方的地面由于下面材料的移除而下沉时,就会发生这种情况。这可能导致环境问题和对地面结构的损害。为了减轻这些风险,在采矿过程中需要进行仔细的规划和监测。技术的进步,例如遥感和地球物理调查,改善了我们预测和有效管理沉降的能力。此外,房间和支柱系统还可能影响矿物回收的效率。虽然它允许安全的采矿实践,但并不总能产生最高比例的资源。在某些情况下,替代采矿方法,例如长壁采矿,可能更有效地提取更大体积的材料。因此,采矿公司必须权衡安全性和稳定性的好处与最大化资源回收的潜力。总之,房间和支柱系统仍然是采矿行业中的一种重要技术,平衡着安全性与效率。其历史意义和持续相关性突显了传统采矿方法在不断发展的领域中的重要性。随着我们继续探索和创新这一行业,理解像房间和支柱系统这样的系统对于可持续和负责任的资源开采至关重要。通过同时采用传统和现代的实践,我们可以确保采矿作业安全、高效且环保,为资源管理的可持续未来铺平道路。
相关单词