back filling

简明释义

充填

英英释义

Back filling refers to the process of refilling an excavated area with the material that was removed, often used in construction or landscaping.

回填是指将挖掘区域用移除的材料重新填充的过程,通常用于建筑或园艺中。

In a broader context, back filling can also refer to the practice of filling in gaps or positions within an organization or team after a vacancy arises.

在更广泛的上下文中,回填还可以指在出现空缺后填补组织或团队中的空缺或职位的做法。

例句

1.The engineer advised that proper back filling 回填 is crucial to prevent future soil erosion.

工程师建议,适当的back filling 回填对防止未来的土壤侵蚀至关重要。

2.They used sand for back filling 回填 around the newly installed fence posts.

他们在新安装的围栏柱周围使用沙子进行back filling 回填

3.Once the excavation was complete, the workers began back filling 回填 with gravel.

挖掘完成后,工人们开始用碎石进行back filling 回填

4.After digging the trench for the pipes, we will begin back filling 回填 to restore the ground level.

挖掘管道沟渠后,我们将开始back filling 回填以恢复地面高度。

5.The construction team started back filling 回填 the foundation after the concrete had set.

建筑团队在混凝土固化后开始进行back filling 回填基础。

作文

In the construction industry, the term back filling refers to the process of refilling an excavated area with soil or other materials after the necessary work has been completed. This procedure is crucial for ensuring the stability and integrity of structures such as foundations, pipelines, and underground utilities. Proper back filling helps to prevent future settlement issues and provides support for the surface above. When a trench is dug for utility installation, for example, it creates a void that needs to be filled once the installation is complete. The back filling process typically involves layering the material in a specific manner to avoid air pockets and ensure even distribution. Engineers and construction workers must carefully consider the type of material used for back filling, as well as the compaction methods employed to achieve the desired density. One common method of back filling is to use the excavated soil itself, provided it meets the necessary criteria for compaction and stability. In some cases, additional materials such as gravel or sand may be added to enhance drainage and reduce the risk of erosion. The choice of material can significantly impact the long-term performance of the structure above. For instance, using poorly graded soil can lead to problems like excessive settlement or water retention, which can compromise the integrity of the built environment. Moreover, the timing of back filling is also vital. It should be done only after thorough inspections have confirmed that all installations are complete and meet safety standards. Rushing this process can lead to costly repairs down the line, as any issues left unaddressed during back filling may not be discovered until significant problems arise. In addition to construction, the concept of back filling can also be applied in various fields such as data management and human resources. In these contexts, back filling refers to the practice of filling a position that has been vacated, often by promoting someone from within the organization or hiring externally. This ensures that the workflow remains uninterrupted and that the team continues to function effectively. For example, when a manager leaves a company, their responsibilities may be temporarily distributed among other team members. However, to maintain productivity and morale, the organization may decide to initiate a back filling process to find a suitable replacement. This not only helps to restore balance within the team but also allows for the opportunity to bring in fresh perspectives and ideas. In conclusion, whether in construction or organizational management, back filling plays a critical role in maintaining stability and continuity. Understanding the nuances of this term can help professionals in various industries make informed decisions that contribute to the overall success of their projects and teams. By prioritizing effective back filling practices, individuals and organizations can safeguard their investments and foster a productive environment for growth and development.

在建筑行业,术语回填指的是在必要工作完成后,用土壤或其他材料重新填充挖掘区域的过程。这个过程对于确保基础、管道和地下设施等结构的稳定性和完整性至关重要。适当的回填有助于防止未来的沉降问题,并为上方的表面提供支撑。例如,当挖掘一个沟渠以安装公用设施时,它会形成一个空洞,一旦安装完成,就需要填充。回填过程通常涉及以特定方式分层材料,以避免空气袋并确保均匀分布。工程师和建筑工人必须仔细考虑用于回填的材料类型,以及采用的压实方法,以达到所需的密度。一种常见的回填方法是使用挖掘出的土壤本身,只要它符合压实和稳定性的必要标准。在某些情况下,可能会添加额外的材料,如砾石或沙子,以增强排水并减少侵蚀风险。材料的选择会显著影响上方结构的长期性能。例如,使用级配不良的土壤可能导致过度沉降或水滞留等问题,从而危及建筑环境的完整性。此外,回填的时机也至关重要。只有在彻底检查确认所有安装完成且符合安全标准后,才应进行此项工作。急于进行此过程可能导致后续昂贵的维修,因为在回填过程中未解决的任何问题,可能直到出现重大问题时才被发现。除了建筑,回填的概念也可以应用于数据管理和人力资源等多个领域。在这些背景下,回填指的是填补已空缺职位的做法,通常通过从内部提升某人或外部招聘来实现。这确保了工作流程不受干扰,团队继续有效运作。例如,当一位经理离开公司时,他们的职责可能会暂时分配给其他团队成员。然而,为了维持生产力和士气,组织可能决定启动回填过程,以找到合适的替代者。这不仅有助于恢复团队的平衡,还为引入新视角和想法提供了机会。总之,无论是在建筑还是组织管理中,回填在维持稳定性和连续性方面发挥着关键作用。理解这个术语的细微差别可以帮助各行业的专业人士做出明智的决策,从而促进他们项目和团队的整体成功。通过优先考虑有效的回填实践,个人和组织可以保护他们的投资,并为成长和发展的生产环境奠定基础。

相关单词

filling

filling详解:怎么读、什么意思、用法