erecting yard

简明释义

装配场

英英释义

A yard or area where structures, such as buildings or ships, are constructed or assembled.

一个用于建造或组装结构(如建筑物或船只)的院子或区域。

例句

1.We are planning to expand the erecting yard 搭建场地 to accommodate more projects.

我们计划扩展搭建场地 erecting yard 以容纳更多项目。

2.Heavy machinery is often stored in the erecting yard 搭建场地 when not in use.

重型机械通常在不使用时存放在搭建场地 erecting yard

3.The construction team spent the entire day at the erecting yard 搭建场地 preparing materials for the new building.

建筑团队整天在搭建场地 erecting yard 准备新建筑的材料。

4.The workers organized the tools in the erecting yard 搭建场地 to ensure efficiency.

工人们在搭建场地 erecting yard 中整理工具以确保高效。

5.Before starting the project, we need to inspect the erecting yard 搭建场地 for any safety hazards.

在开始项目之前,我们需要检查一下搭建场地 erecting yard 是否存在安全隐患。

作文

In the construction industry, the term erecting yard refers to a designated area where components of a structure are assembled before being transported to the final site for installation. This process is crucial for ensuring that all parts fit together perfectly and that any necessary adjustments can be made prior to the actual erection of the building. The erecting yard serves as a staging ground where workers can efficiently manage resources, tools, and materials, ultimately leading to a smoother construction process.One of the primary benefits of utilizing an erecting yard is the enhanced safety it provides. By assembling components in a controlled environment, workers can adhere to safety protocols and minimize the risks associated with working on-site. For instance, heavy machinery and cranes can be used more effectively within the confines of the erecting yard, allowing for safer handling of large materials. Additionally, having a dedicated space for assembly means that the surrounding areas remain clear of unnecessary hazards, reducing the likelihood of accidents.Moreover, the erecting yard allows for better quality control. As components are assembled, they can be inspected thoroughly before being sent to the construction site. This preemptive measure ensures that any defects or issues can be addressed early on, preventing costly delays during the actual construction phase. Workers can take their time to ensure that every piece meets the required standards, which is often more difficult to achieve once construction has begun.The efficiency gained from using an erecting yard cannot be overstated. When components are assembled off-site, the actual construction timeline can be significantly shortened. This is because workers can focus solely on the installation of pre-assembled units rather than spending time on individual fabrication. As a result, projects can be completed more quickly, which is beneficial for both contractors and clients alike. Furthermore, this approach can lead to cost savings, as labor and material expenses can be better managed.In addition to these practical advantages, the use of an erecting yard also allows for improved collaboration among various teams involved in the construction process. Engineers, architects, and construction workers can work together in a centralized location to address any design challenges or modifications that may arise. This collaborative environment fosters communication and innovation, which ultimately contributes to the overall success of the project.However, establishing an erecting yard does come with its own set of challenges. Location is a critical factor; the yard must be situated close enough to the construction site to facilitate easy transportation of assembled components. Additionally, zoning regulations and environmental considerations must be taken into account when selecting a site for the erecting yard. Proper planning and coordination are essential to ensure that the yard operates smoothly and effectively.In conclusion, the concept of an erecting yard plays a vital role in modern construction practices. Its benefits include enhanced safety, improved quality control, increased efficiency, and better collaboration among teams. While there are challenges to consider, the advantages often outweigh the drawbacks, making the erecting yard an indispensable element in the successful completion of construction projects. As the industry continues to evolve, the importance of such facilities will likely grow, paving the way for even more innovative approaches to building construction.

在建筑行业中,术语erecting yard指的是一个指定的区域,在这个区域内,结构的组件被组装起来,然后再运输到最终的安装现场。这个过程对于确保所有部件完美契合以及在实际建造之前进行必要的调整至关重要。erecting yard作为一个集结场所,使工人能够有效地管理资源、工具和材料,从而最终实现更顺畅的施工过程。利用erecting yard的主要好处之一是它提供了更高的安全性。在受控环境中组装组件,可以让工人遵循安全规程,最大限度地减少在现场工作时的风险。例如,重型机械和起重机可以在erecting yard的范围内更有效地使用,从而更安全地处理大型材料。此外,拥有专门的组装空间意味着周围区域保持清晰,减少了不必要的危险,降低了事故发生的可能性。此外,erecting yard还允许更好的质量控制。在组装过程中,可以在运输到施工现场之前对组件进行彻底检查。这种预防措施确保任何缺陷或问题可以在早期解决,防止在实际施工阶段出现昂贵的延误。工人可以花时间确保每个部件都符合要求的标准,这在施工开始后往往更难实现。利用erecting yard所获得的效率不容小觑。当组件在现场外组装时,实际的施工时间表可以显著缩短。这是因为工人可以专注于预组装单元的安装,而不是花时间进行单独的制造。因此,项目可以更快地完成,这对承包商和客户都是有利的。此外,这种方法可以节省成本,因为劳动和材料费用可以得到更好的管理。除了这些实际优势,使用erecting yard还允许参与施工过程的各个团队之间改善合作。工程师、建筑师和建筑工人可以在一个集中地点一起工作,以解决任何设计挑战或可能出现的修改。这种协作环境促进了沟通和创新,最终有助于项目的整体成功。然而,建立erecting yard也面临着一系列挑战。位置是一个关键因素;该场地必须靠近施工现场,以便于运输组装好的组件。此外,在选择erecting yard的地点时,还必须考虑区域法规和环境因素。适当的规划和协调对于确保场地顺利有效地运作至关重要。总之,erecting yard的概念在现代建筑实践中发挥着至关重要的作用。它的好处包括增强的安全性、改善的质量控制、提高的效率和更好的团队协作。尽管需要考虑挑战,但优势往往超过缺点,使得erecting yard成为成功完成建筑项目不可或缺的元素。随着行业的不断发展,这种设施的重要性可能会进一步增长,为建筑施工的创新方法铺平道路。

相关单词

erecting

erecting详解:怎么读、什么意思、用法