screeding

简明释义

[ˈskriːdɪŋ][ˈskridɪŋ]

n. 沙浆底层;抹平;冲筋工作

英英释义

Screeding refers to the process of leveling a surface, typically a floor, by applying a thin layer of material such as concrete or mortar.

screeding指的是通过施加一层薄材料(如混凝土或砂浆)来平整表面的过程,通常用于地面。

单词用法

screeding process

平整过程

screeding machine

平整机

screeding material

平整材料

apply screeding

施加平整层

perform screeding

进行平整作业

screeding floor

平整地面

同义词

leveling

找平

The contractor is leveling the floor before laying tiles.

承包商在铺砖之前正在找平地面。

flattening

压平

After pouring the concrete, they began flattening the surface.

浇筑混凝土后,他们开始压平表面。

smoothing

抹平

Smoothing out the surface is essential for a good finish.

抹平表面对获得良好的效果至关重要。

反义词

roughing

粗糙处理

The surface was left in a roughing state before the final finish.

表面在最终处理之前保持了粗糙状态。

denting

凹陷

Denting the surface can lead to unevenness that requires additional screeding.

表面凹陷可能导致不平整,需要额外的找平处理。

例句

1.The paving process of asphalt paver and the action between mixture and screed are analyzed in order to solve the problems in kinematics model of screeding unit.

为了解决沥青混凝土摊铺机熨平装置运动学模型存在的问题,分析了摊铺机的摊铺过程以及混合料与熨平板之间的作用关系。

2.It finds flashing at draining ditch and rain water opining. It can begin leveling with trowel after screeding.

在排水沟、雨水口处找出泛水,冲筋后即可进行抹找平层。

3.The oscillating frequency and amplitude of screeding device of multifunctional paver influence the paving surface on smoothness and compaction greatly.

多功能摊铺机熨平工作装置的振捣频率和振幅对摊铺层的平整度和密实度的影响是非常大的。

4.The paving process of asphalt paver and the action between mixture and screed are analyzed in order to solve the problems in kinematics model of screeding unit.

为了解决沥青混凝土摊铺机熨平装置运动学模型存在的问题,分析了摊铺机的摊铺过程以及混合料与熨平板之间的作用关系。

5.After the concrete is poured, screeding must be done to achieve a flat surface.

在混凝土浇筑后,必须进行找平以达到平坦的表面。

6.She used a long board for screeding the wet cement.

她用一块长板对湿水泥进行找平

7.Proper screeding ensures that the surface is smooth and level.

正确的找平可以确保表面光滑且平整。

8.The team finished screeding the driveway ahead of schedule.

团队提前完成了车道的找平工作。

9.The contractor is responsible for the screeding of the floor before laying the tiles.

承包商负责在铺设瓷砖之前对地面进行找平

作文

In the world of construction and flooring, the term screeding refers to the process of leveling a floor surface before the final flooring material is applied. This crucial step ensures that the floor is smooth, even, and ready to support the weight of furniture and foot traffic. Proper screeding can make a significant difference in the longevity and appearance of the finished floor. It involves the application of a thin layer of material, usually a cement-based mix, over a subfloor to create a flat and level surface. This process not only enhances the aesthetic appeal of the space but also improves its functionality.One of the primary reasons for screeding is to correct any imperfections in the subfloor. Subfloors can often have dips, bumps, or uneven areas due to various factors such as settling, water damage, or poor installation. By applying a screed, these imperfections can be smoothed out, providing a solid foundation for the final flooring material. Without proper screeding, flooring materials like tiles, hardwood, or laminate can crack, warp, or become damaged over time.The screeding process typically begins with preparing the subfloor. This may involve cleaning the surface, repairing any damages, and ensuring that it is dry and free from debris. Once the preparation is complete, the screed mixture is applied. There are different types of screeds available, including traditional sand and cement screeds, fast-setting screeds, and self-leveling compounds. The choice of screed depends on the specific requirements of the project, such as the desired finish, drying time, and the type of flooring that will be installed on top.After the screed is applied, it must be leveled and smoothed out to ensure an even surface. This is often done using a straightedge or a screeding tool, which helps to distribute the material evenly across the surface. The screed is then left to cure, which can take anywhere from a few hours to several days, depending on the type of material used and the environmental conditions.Once the screeding has cured, it is essential to check the level and flatness of the surface before proceeding with the installation of the final flooring material. Any discrepancies should be addressed to avoid complications later on. In some cases, additional leveling compounds may be applied to achieve the desired flatness.In conclusion, screeding is a vital step in the flooring installation process that should not be overlooked. It provides a stable and level foundation for various types of flooring, ensuring durability and a professional finish. Whether you are a contractor or a DIY enthusiast, understanding the importance of screeding will help you achieve better results in your flooring projects. Investing time and effort into this process will ultimately lead to a more successful and aesthetically pleasing outcome, making your space both functional and beautiful.

在建筑和地板的世界中,术语screeding指的是在最终地板材料应用之前,对地面进行平整的过程。这一步骤至关重要,确保地面光滑、均匀,并能够承受家具和人流的重量。适当的screeding可以显著影响成品地板的耐用性和外观。该过程通常涉及在基层上涂抹一层薄薄的材料,通常是基于水泥的混合物,以创建一个平坦和水平的表面。这个过程不仅增强了空间的美观,还改善了其功能性。进行screeding的主要原因之一是纠正基层的任何缺陷。基层由于各种因素(如沉降、水损害或安装不当)常常会有凹陷、凸起或不平整的区域。通过应用找平层,这些缺陷可以被平滑掉,为最终的地板材料提供坚实的基础。如果没有适当的screeding,瓷砖、硬木或层压板等地板材料可能会随着时间的推移而开裂、变形或受损。screeding过程通常从准备基层开始。这可能涉及清洁表面、修复任何损坏,并确保其干燥且无杂物。一旦准备工作完成,便可以应用找平层混合物。市场上有不同类型的找平层,包括传统的沙子和水泥找平层、快速固化找平层和自流平化合物。选择哪种找平层取决于项目的具体要求,例如所需的表面效果、干燥时间以及将要安装的地板类型。在找平层应用后,必须对表面进行平整和光滑处理,以确保均匀的表面。这通常使用直边或找平工具来完成,帮助将材料均匀分布在表面上。然后,让找平层固化,固化时间可能从几个小时到几天不等,具体取决于所用材料的类型和环境条件。一旦screeding固化,就必须在继续安装最终地板材料之前检查表面的水平和平整度。任何差异都应得到解决,以避免以后出现问题。在某些情况下,可能还需要再涂覆一层找平化合物以达到所需的平整度。总之,screeding是在地板安装过程中一个至关重要的步骤,不容忽视。它为各种类型的地板提供了稳定和平坦的基础,确保耐用性和专业的外观。无论您是承包商还是DIY爱好者,理解screeding的重要性将帮助您在地板项目中取得更好的结果。投入时间和精力于这一过程,最终将导致更成功和美观的结果,使您的空间既实用又美丽。