battery limits

简明释义

界区;

英英释义

Battery limits refer to the defined boundaries of a project or facility within which specific operations, processes, or activities are conducted.

电池限制指的是项目或设施的定义边界,在这些边界内进行特定的操作、过程或活动。

例句

1.The design phase must adhere to the battery limits 电池限制 set by the client.

设计阶段必须遵守客户设定的battery limits 电池限制

2.During the meeting, the engineers discussed the battery limits 电池限制 for the new facility's construction.

在会议上,工程师们讨论了新设施建设的battery limits 电池限制

3.The project manager explained that the team must work within the battery limits 电池限制 defined in the contract.

项目经理解释说,团队必须在合同中定义的battery limits 电池限制内工作。

4.The contractor was reminded to stay within the battery limits 电池限制 of the budget allocated for the project.

承包商被提醒要保持在项目分配的预算battery limits 电池限制内。

5.It's essential to identify the battery limits 电池限制 before starting the environmental impact assessment.

在开始环境影响评估之前,识别battery limits 电池限制是至关重要的。

作文

In the world of engineering and project management, the term battery limits is crucial for defining the scope of a project. It refers to the physical boundaries or limits within which a particular system operates. For instance, in a chemical plant, the battery limits would delineate the area from where raw materials are received to where the final products are dispatched. Understanding these limits is essential for effective planning, execution, and management of any project.The concept of battery limits is not just about physical boundaries; it also encompasses the operational and functional aspects of a project. By clearly defining these limits, project managers can better allocate resources, manage risks, and ensure that all team members are aligned with the project's goals. When everyone understands the battery limits, it minimizes confusion and enhances collaboration among different departments involved in the project.Moreover, identifying the battery limits helps in establishing accountability. Each team or individual knows their responsibilities within the defined boundaries. This clarity is vital in large projects where multiple teams work simultaneously on different components. Without well-defined battery limits, there can be overlaps in responsibilities or gaps in coverage, leading to delays and increased costs.From a financial perspective, having clear battery limits is also beneficial. It allows for accurate budgeting and cost estimation. When the scope is well-defined, it becomes easier to predict expenses related to materials, labor, and other resources. This financial foresight is critical for stakeholders who need to understand the potential return on investment.In addition to these practical benefits, understanding the battery limits can also enhance safety protocols. In industries such as oil and gas or pharmaceuticals, safety is paramount. By defining the battery limits, companies can implement safety measures tailored to the specific risks associated with that area. This focused approach to safety helps in preventing accidents and ensuring compliance with regulatory standards.Furthermore, the concept of battery limits extends beyond physical projects. In software development, for example, establishing battery limits can refer to the boundaries of a software module or system. This definition helps developers understand what functionalities are included and what falls outside their responsibility. Such clarity is essential in agile development environments where rapid iterations and changes are common.In conclusion, the term battery limits serves as a fundamental principle in various fields, including engineering, project management, finance, and safety. By clearly defining these boundaries, organizations can improve efficiency, accountability, and safety while minimizing risks and costs. Whether in a physical plant or a digital environment, understanding and implementing battery limits is key to the success of any project. As industries continue to evolve, the importance of this concept will only grow, making it an essential aspect of modern project management practices.

在工程和项目管理的世界中,术语battery limits对于定义项目范围至关重要。它指的是一个特定系统运行的物理边界或限制。例如,在化工厂中,battery limits将划定从接收原材料到发运最终产品的区域。理解这些限制对于任何项目的有效规划、执行和管理都是必不可少的。Battery limits的概念不仅仅涉及物理边界;它还包括项目的操作和功能方面。通过清晰地定义这些限制,项目经理可以更好地分配资源、管理风险,并确保所有团队成员与项目目标保持一致。当每个人都理解battery limits时,可以减少混淆,增强不同部门之间的协作。此外,识别battery limits还有助于建立责任感。每个团队或个人都知道他们在定义的边界内的职责。这种清晰度在多个团队同时处理不同组件的大型项目中至关重要。如果没有明确的battery limits,可能会出现责任重叠或覆盖空白,从而导致延误和成本增加。从财务角度来看,清晰的battery limits也是有益的。它允许准确的预算和成本估算。当范围明确定义时,预测与材料、劳动力和其他资源相关的费用变得更加容易。这种财务前瞻性对于需要了解潜在投资回报的利益相关者至关重要。除了这些实际的好处之外,理解battery limits还可以增强安全协议。在石油和天然气或制药等行业,安全至关重要。通过定义battery limits,公司可以实施针对该区域特定风险的安全措施。这种针对性的安全方法有助于防止事故并确保遵守监管标准。此外,battery limits的概念超越了物理项目。例如,在软件开发中,建立battery limits可以指软件模块或系统的边界。这一定义帮助开发人员理解哪些功能包含在内,哪些不在其责任范围内。这种清晰度在快速迭代和变化常见的敏捷开发环境中至关重要。总之,术语battery limits在工程、项目管理、财务和安全等各个领域都作为基本原则。通过清晰地定义这些边界,组织可以提高效率、责任感和安全性,同时最小化风险和成本。无论是在物理工厂还是数字环境中,理解和实施battery limits是任何项目成功的关键。随着行业的不断发展,这一概念的重要性只会增加,使其成为现代项目管理实践的一个重要方面。

相关单词

battery

battery详解:怎么读、什么意思、用法

limits

limits详解:怎么读、什么意思、用法