assigned total depth
简明释义
指定总井深;
英英释义
例句
1.The contractor was informed of the assigned total depth for the excavation work.
承包商被告知挖掘工作的指定总深度。
2.The engineer adjusted the plans to accommodate the assigned total depth required for the foundation.
工程师调整了计划,以适应基础所需的指定总深度。
3.The drilling team confirmed the assigned total depth of 500 meters for the new well.
钻探团队确认新井的指定总深度为500米。
4.Before starting the project, we need to verify the assigned total depth in the geological report.
在项目开始之前,我们需要核实地质报告中的指定总深度。
5.During the review, it was noted that the assigned total depth exceeded safety regulations.
在审查过程中,注意到指定总深度超过了安全规定。
作文
In the field of engineering and construction, understanding various terminologies is crucial for effective communication and project execution. One such term that often arises in discussions about excavation and foundation work is assigned total depth. This phrase refers to the predetermined depth that has been specified for a particular construction project, often determined by design requirements, soil conditions, and structural needs. The assigned total depth is essential for ensuring that the foundations of a building or structure are stable and secure, as it directly influences the load-bearing capacity and overall integrity of the construction. When planning a construction project, engineers must take into account several factors that will affect the assigned total depth. These factors include the type of soil at the site, the weight of the structure being built, and any local building codes or regulations that may dictate minimum depth requirements. For instance, in areas with unstable soil or high water tables, the assigned total depth may need to be increased to ensure that the foundation can adequately support the structure without risk of settling or shifting over time. Moreover, the assigned total depth can also vary depending on the specific use of the building. Residential homes may have different depth requirements compared to commercial buildings or industrial facilities. For example, a high-rise office building may require a deeper foundation than a single-story house due to the greater loads it must support. Therefore, accurately determining the assigned total depth is vital not only for compliance with safety standards but also for the longevity of the structure. In practice, once the assigned total depth has been established, construction teams must carefully adhere to this specification during excavation and foundation work. Deviating from the assigned total depth can lead to serious issues, including structural failure, increased costs, and delays in project timelines. For this reason, it is common for engineers to conduct regular inspections throughout the excavation process to ensure that the depth being achieved aligns with the originally assigned total depth. Additionally, technology plays a significant role in how we determine and adhere to the assigned total depth. Modern tools such as laser levels and GPS-guided excavation equipment allow for precise measurements and adjustments on-site, which helps to mitigate errors that could compromise the foundation’s integrity. As construction technology continues to evolve, the methods for calculating and achieving the assigned total depth are becoming increasingly sophisticated, leading to safer and more reliable construction practices. In conclusion, the term assigned total depth encompasses a critical aspect of construction and engineering that requires careful consideration and adherence to ensure the success of a project. By understanding the implications of the assigned total depth, construction professionals can better navigate the complexities of building design and execution, ultimately contributing to the safe and effective development of structures that meet the needs of their communities. A thorough grasp of this concept not only enhances individual projects but also upholds the broader standards of safety and quality within the construction industry.
在工程和建筑领域,理解各种术语对于有效的沟通和项目执行至关重要。一个经常出现在关于挖掘和基础工作讨论中的术语是assigned total depth。这个短语指的是为特定建筑项目指定的预定深度,通常由设计要求、土壤条件和结构需求决定。assigned total depth对于确保建筑或结构的基础稳定和安全至关重要,因为它直接影响承载能力和整体结构的完整性。在规划建筑项目时,工程师必须考虑几个因素,这些因素将影响assigned total depth。这些因素包括现场的土壤类型、建筑物的重量以及任何可能规定最低深度要求的地方建筑法规。例如,在土壤不稳定或水位较高的地区,assigned total depth可能需要增加,以确保基础能够充分支撑结构,而不会因时间的推移而出现沉降或移动的风险。此外,assigned total depth也可能根据建筑物的具体用途而有所不同。住宅房屋与商业建筑或工业设施的深度要求可能不同。例如,高层办公楼可能需要比单层住宅更深的基础,因为它必须支撑更大的负荷。因此,准确确定assigned total depth不仅对遵守安全标准至关重要,而且对结构的耐久性也是如此。在实践中,一旦确定了assigned total depth,施工团队必须在挖掘和基础工作中仔细遵循这一规范。偏离assigned total depth可能导致严重问题,包括结构失效、成本增加和项目时间表延误。因此,工程师通常会在整个挖掘过程中进行定期检查,以确保所达到的深度与最初的assigned total depth一致。此外,技术在我们确定和遵循assigned total depth方面发挥着重要作用。现代工具如激光水平仪和GPS引导的挖掘设备允许在现场进行精确测量和调整,从而帮助减少可能危及基础完整性的错误。随着建筑技术的不断发展,计算和实现assigned total depth的方法变得越来越复杂,从而导致更安全、更可靠的建筑实践。总之,术语assigned total depth涵盖了建筑和工程的一个关键方面,该方面需要仔细考虑和遵循,以确保项目的成功。通过理解assigned total depth的含义,建筑专业人士可以更好地应对建筑设计和执行的复杂性,最终有助于安全有效地开发满足社区需求的结构。对这一概念的透彻理解不仅提升了个别项目的质量,还维护了建筑行业内更广泛的安全和质量标准。