to geta derrick up
简明释义
起吊杆
英英释义
To erect a derrick, which is a type of crane used for lifting heavy loads, typically in construction or maritime settings. | 搭建一种起重机,通常用于建筑或海事环境中,用于提升重物。 |
例句
1.They are planning to get a derrick up next week to assist with the drilling operation.
他们计划下周搭起一座起重机,以协助钻探作业。
2.It took several hours to get a derrick up, but it was worth it for the efficiency it brought.
搭起一座起重机花了几个小时,但这带来的效率是值得的。
3.The crane operator was skilled and managed to get a derrick up without any issues.
起重机操作员技术熟练,成功地搭起了一座起重机,没有遇到任何问题。
4.The construction team needs to get a derrick up quickly to lift the heavy beams into place.
施工队需要搭起一座起重机,以便快速将重梁放置到位。
5.Before we can start the project, we have to get a derrick up on site for the materials.
在我们开始项目之前,我们必须在现场搭起一座起重机来搬运材料。
作文
In the world of construction and engineering, the term to get a derrick up is often used to describe the process of erecting a type of crane that is pivotal for lifting heavy materials. A derrick is a framework or tower that supports a hoist, and it is essential in various industries, including oil drilling, shipping, and building construction. Understanding how to to get a derrick up is crucial for ensuring safety and efficiency on a construction site.The first step in to get a derrick up involves careful planning and preparation. Crews must assess the area where the derrick will be erected, ensuring that the ground is stable and capable of supporting the weight of the structure. This includes checking for underground utilities and ensuring that there are no obstacles that could interfere with the operation of the derrick. Proper planning also involves securing the necessary permits and coordinating with local authorities to comply with regulations.Once the planning phase is complete, the next step in to get a derrick up is to assemble the components of the derrick. This typically involves transporting the parts to the construction site and using cranes or other machinery to position them correctly. Workers must follow specific guidelines and safety protocols during this phase to prevent accidents. Each piece of the derrick must be carefully lifted and secured, ensuring that it is stable before moving on to the next component.After the assembly is complete, the crew will then focus on to get a derrick up by raising the structure into its vertical position. This is often the most critical part of the process, as it requires precise coordination among team members to ensure that the derrick is raised safely. Workers use ropes, pulleys, and other mechanical systems to lift the derrick slowly and steadily. Communication is key during this phase to avoid any miscalculations that could lead to dangerous situations.Once the derrick is upright, the final steps involve securing it in place. This includes anchoring the derrick to the ground and ensuring that all safety features, such as brakes and emergency stops, are functional. Inspectors may conduct a thorough review of the setup to confirm that it meets all safety standards before any lifting operations begin. Only after these checks are completed can the crew confidently say they have successfully to get a derrick up.In conclusion, the phrase to get a derrick up encapsulates a series of intricate steps that require teamwork, precision, and adherence to safety protocols. Whether in construction, oil drilling, or other heavy-lifting scenarios, understanding how to properly erect a derrick is vital. It not only ensures the smooth operation of construction projects but also safeguards the lives of workers on site. Mastering the art of to get a derrick up is a testament to the skills and dedication of those in the engineering and construction fields.
在建筑和工程的世界中,术语to get a derrick up通常用于描述竖起一种对提升重物至关重要的起重机的过程。德里克是一种支撑起重机的框架或塔,它在包括石油钻探、航运和建筑施工等多个行业中都是必不可少的。理解如何to get a derrick up对于确保施工现场的安全和效率至关重要。to get a derrick up的第一步涉及仔细的规划和准备。工作人员必须评估德里克将要竖立的区域,确保地面稳定并能够承受结构的重量。这包括检查地下公用设施,并确保没有障碍物可能干扰德里克的操作。适当的规划还包括获得必要的许可证,并与地方当局协调,以遵守法规。一旦规划阶段完成,to get a derrick up的下一步是组装德里克的组件。这通常涉及将部件运输到施工现场,并使用起重机或其他机械设备将它们正确定位。在这个阶段,工人必须遵循特定的指导方针和安全协议,以防止事故的发生。德里克的每个部分都必须小心地提升和固定,确保在移动到下一个组件之前它是稳定的。组装完成后,团队将专注于to get a derrick up,将结构提升到垂直位置。这通常是过程中的关键部分,因为这需要团队成员之间的精确协调,以确保德里克安全地升起。工人们使用绳索、滑轮和其他机械系统缓慢而稳当地提升德里克。在这个阶段,沟通至关重要,以避免任何可能导致危险情况的错误计算。一旦德里克竖立起来,最后的步骤涉及将其固定到位。这包括将德里克锚定到地面,并确保所有安全功能,如刹车和紧急停止,都是功能性的。检查员可能会对设置进行全面审查,以确认其符合所有安全标准,然后才能开始任何提升操作。只有在这些检查完成后,团队才能自信地说他们成功地to get a derrick up。总之,短语to get a derrick up概括了一系列复杂的步骤,这些步骤需要团队合作、精确性和遵循安全协议。无论是在建筑、石油钻探还是其他重物提升场景中,理解如何正确竖起德里克至关重要。它不仅确保了施工项目的顺利进行,还保护了现场工人的生命。掌握to get a derrick up的艺术是对工程和建筑领域从业者技能和奉献精神的证明。
相关单词