subtask

简明释义

[/ˈsʌb.tæsk/][/ˈsʌbˌtæsk/]

n. 子任务;程序子基元

英英释义

A subtask is a smaller, more manageable task that is part of a larger task or project.

子任务是一个较小、更易管理的任务,它是一个更大任务或项目的一部分。

单词用法

subtask management

子任务管理

subtask assignment

子任务分配

subtask completion

子任务完成

subtask tracking

子任务跟踪

major task and its subtasks

主要任务及其子任务

define subtasks clearly

清晰定义子任务

prioritize subtasks

优先处理子任务

subtasks of a project

项目的子任务

同义词

task

任务

I have a subtask to complete before the main project deadline.

在主项目截止日期之前,我有一个子任务需要完成。

assignment

分配的任务

Each team member is assigned a specific task to ensure the project runs smoothly.

每个团队成员被分配了一个特定的任务,以确保项目顺利进行。

duty

职责

The assignment was broken down into smaller duties for easier management.

该任务被分解为较小的职责,以便于管理。

job

工作

This job requires several subtasks to be completed in order.

这项工作需要按顺序完成几个子任务。

activity

活动

We have various activities planned to achieve our main goal.

我们计划了各种活动来实现我们的主要目标。

反义词

main task

主任务

The main task of the project is to improve customer satisfaction.

这个项目的主任务是提高客户满意度。

primary task

主要任务

We need to focus on the primary task before addressing any subtasks.

我们需要在处理任何子任务之前,先专注于主要任务。

例句

1.A heartbeat message and subtask oriented fault tolerance policy were also used which can achieve the reliability.

自愿机端的心跳消息和面向子任务的容错方式可以达到可靠性高的效果。

2.Makes the new task a subtask of another task.

使新任务成为另一个任务的子任务。

3.Topic tracking is a subtask of TDT. It aims at monitoring the stream of news stories to find additional stories on a topic that is identified using several sample stories.

话题追踪是TDT的一个子任务,它的目的是监控新闻故事流识别出与预先给定几个新闻故事表述的话题相关的后继故事。

4.You can create a subtask to refer work to another user, view subtasks, and view their status.

您可以创建子任务以将工作委托给另一个用户、查看子任务,以及查看子任务的状态。

5.The cheat sheet content in Listing 3 defines a root task group containing two subtask groups, each containing two tasks.

清单3中的备忘单内容定义了包含两个子任务组的根任务组,每一个子任务组包含两个任务。

6.When a user claims a task, the user can delegate a portion of task to another user, which puts the human task in the subtask state.

当用户认领某个任务时,该用户可以将任务的某个部分委托给另一个用户,从而将人工任务置于子任务状态。

7.NPI project Leader will collect and review plans for subtask from project Team members from cross functional department, then create schedule for NPI project.

新产品导入项目领导人将收集和汇总各个职能部门的计划,来构成新产品导入计划。

8.Multiple support vector machine can perform more complex tasks because every support vector machine only finish the subtask.

由于每个子网络只完成相应的子任务,因而多支撑向量网络可以解决更为复杂的学习任务。

9.As an important subtask of topic detection and tracking, topic tracking identifies and collects relevant stories on certain topics from information stream.

作为话题检测与跟踪的重要研究子课题,话题跟踪针对特定话题,识别后续信息流中的相关报道。

10.In project management, each phase can be divided into smaller subtasks (子任务) to ensure better tracking.

在项目管理中,每个阶段可以分成更小的子任务 (子任务) 以确保更好的跟踪。

11.The project consists of several main tasks, each with its own subtasks (子任务).

该项目由几个主要任务组成,每个任务都有其自己的子任务 (子任务) 。

12.A subtask (子任务) might involve conducting research before writing the final paper.

一个子任务 (子任务) 可能涉及在撰写最终论文之前进行研究。

13.When developing software, a developer might create a subtask (子任务) for fixing a specific bug.

在开发软件时,开发人员可能会创建一个子任务 (子任务) 来修复特定的错误。

14.To finish the report on time, she assigned a subtask (子任务) to each team member.

为了按时完成报告,她给每个团队成员分配了一个子任务 (子任务) 。

作文

In today's fast-paced world, project management has become an essential skill for professionals across various fields. One of the key concepts in effective project management is the division of work into manageable parts. This is where the term subtask (子任务) comes into play. A subtask refers to a smaller, more specific task that is part of a larger project or assignment. By breaking down a large project into subtasks (子任务), individuals and teams can focus on completing each component efficiently, which ultimately contributes to the successful completion of the overall project.For instance, consider a team tasked with developing a new software application. The project may be too complex to tackle all at once, so the team can break it down into several subtasks (子任务). These could include conducting market research, designing user interfaces, coding the application, and testing for bugs. Each subtask (子任务) can be assigned to different team members based on their expertise, allowing for a more organized approach to the project.Moreover, using subtasks (子任务) helps in tracking progress. By setting clear objectives for each subtask (子任务), project managers can easily monitor how much work has been completed and what still needs to be done. This not only increases accountability among team members but also provides a clearer picture of the project's timeline. If any subtask (子任务) falls behind schedule, adjustments can be made to ensure that the overall project remains on track.Additionally, the use of subtasks (子任务) can enhance collaboration within a team. When tasks are divided into smaller components, it becomes easier for team members to communicate and coordinate their efforts. For example, if one member is responsible for the user interface design while another is focused on coding, they can regularly check in with each other to ensure their work aligns seamlessly. This collaborative effort fosters a sense of teamwork and can lead to innovative solutions that might not have emerged if the project were approached as a single, monolithic task.Furthermore, the concept of subtasks (子任务) is not limited to professional settings. Students can also benefit from this approach when tackling large assignments or projects. For example, when working on a research paper, a student might break the project down into subtasks (子任务) such as selecting a topic, gathering sources, outlining the paper, writing drafts, and editing the final version. This method not only makes the work feel less overwhelming but also allows for a more structured and efficient writing process.In conclusion, the idea of breaking down projects into subtasks (子任务) is a powerful strategy that enhances productivity, improves collaboration, and facilitates progress tracking. Whether in a professional environment or an academic setting, understanding and implementing subtasks (子任务) can lead to more successful outcomes. As we continue to navigate increasingly complex projects, embracing the concept of subtasks (子任务) will undoubtedly prove to be a valuable tool in our toolkit.

在当今快节奏的世界中,项目管理已成为各个领域专业人士的一项重要技能。有效项目管理的关键概念之一是将工作分解为可管理的部分。这就是术语subtask(子任务)的用武之地。subtask(子任务)指的是属于更大项目或任务的一部分的小型、更具体的任务。通过将大型项目分解为subtasks(子任务),个人和团队可以专注于高效完成每个组件,从而最终有助于整个项目的成功完成。例如,考虑一个团队负责开发新的软件应用程序。这个项目可能过于复杂,不可能一次性解决,因此团队可以将其分解为几个subtasks(子任务)。这些可能包括进行市场研究、设计用户界面、编写应用程序代码以及测试漏洞。每个subtask(子任务)可以根据团队成员的专业知识分配给不同的团队成员,从而使项目的处理更加有序。此外,使用subtasks(子任务)有助于跟踪进度。通过为每个subtask(子任务)设定明确的目标,项目经理可以轻松监控已经完成了多少工作,还有多少工作需要完成。这不仅增加了团队成员的责任感,还提供了项目时间表的更清晰的图景。如果任何subtask(子任务)落后于计划,可以做出调整以确保整体项目保持在轨道上。此外,subtasks(子任务)的使用还可以增强团队内的协作。当任务被分解为较小的组件时,团队成员之间的沟通和协调工作变得更加容易。例如,如果一位成员负责用户界面设计,而另一位专注于编码,他们可以定期相互检查,以确保他们的工作无缝对接。这种合作努力促进了团队合作的感觉,并可能导致那些如果将项目视为单一的、整体的任务而无法出现的创新解决方案。此外,subtasks(子任务)的概念并不限于专业环境。学生在处理大型作业或项目时也可以从这种方法中受益。例如,在撰写研究论文时,学生可能会将项目分解为subtasks(子任务),如选择主题、收集资料、列出大纲、撰写草稿和编辑最终版本。这种方法不仅使工作感觉不那么压倒,而且还允许更结构化和高效的写作过程。总之,将项目分解为subtasks(子任务)的想法是一种增强生产力、改善协作和促进进度跟踪的强大策略。无论是在专业环境还是学术环境中,理解和实施subtasks(子任务)都可以导致更成功的结果。随着我们继续应对日益复杂的项目,接受subtasks(子任务)的概念无疑将成为我们工具箱中的一项宝贵工具。