leading pile
简明释义
导桩
英英释义
例句
1.During the inspection, the engineer found that the leading pile had settled more than expected.
在检查过程中,工程师发现领先桩的沉降超过了预期。
2.The construction team decided to use a leading pile to support the new bridge structure.
施工团队决定使用领先桩来支撑新的桥梁结构。
3.The project manager emphasized the importance of properly installing the leading pile to avoid future complications.
项目经理强调了正确安装领先桩的重要性,以避免未来的复杂问题。
4.In geotechnical engineering, a leading pile is often used to enhance stability in soft soil conditions.
在岩土工程中,领先桩通常用于增强软土条件下的稳定性。
5.The architect specified a leading pile for the foundation to ensure long-term durability.
建筑师指定了一个领先桩作为基础,以确保长期耐用性。
作文
In the world of construction and engineering, the term leading pile refers to a type of foundation element that is driven into the ground to support structures. A leading pile is typically the first pile installed in a group of piles, serving as a guide for the subsequent piles. This process is crucial because it ensures that the entire foundation system is aligned and properly positioned. The significance of a leading pile cannot be overstated, as it plays a vital role in distributing loads and maintaining the stability of the structure above it.The installation of a leading pile involves careful planning and execution. Engineers must assess the soil conditions, load requirements, and environmental factors before determining the appropriate type and size of the pile. Once the leading pile is installed, it acts as a benchmark for the other piles, which are driven into the ground in relation to it. This alignment is essential for ensuring that the load is evenly distributed across all piles, thereby enhancing the overall strength and durability of the foundation.Moreover, the use of a leading pile can significantly reduce the risk of uneven settlement, which can lead to structural problems over time. By providing a solid reference point, the leading pile helps to maintain the integrity of the foundation, especially in challenging soil conditions. For instance, in areas with loose or unstable soil, the leading pile may need to be driven deeper to reach more stable strata. This adaptability is one of the reasons why engineers prioritize the selection and installation of a reliable leading pile.In addition to its technical benefits, the leading pile also has implications for project timelines and costs. A well-placed leading pile can streamline the construction process by providing a clear framework for the rest of the foundation work. This efficiency can save both time and money, making it an attractive option for builders and developers.Furthermore, the concept of a leading pile can extend beyond physical construction. In a metaphorical sense, it can represent the importance of having a strong foundation in any project or endeavor. Just as a leading pile supports a building, strong principles and values can guide individuals and organizations toward success. Establishing a clear vision and purpose at the outset can serve as a leading pile for future decisions, helping to navigate challenges and achieve goals.In conclusion, the leading pile is a fundamental component in the field of construction and engineering. Its role as the first pile installed in a foundation system is critical for ensuring alignment, stability, and load distribution. Understanding the significance of a leading pile allows engineers and builders to create safer, more durable structures. Beyond its technical implications, the idea of a leading pile can also inspire individuals to establish strong foundations in their personal and professional lives, guiding them toward success and resilience in the face of challenges.
在建筑和工程领域,术语leading pile指的是一种基础元素,它被打入地下以支撑结构。leading pile通常是一组桩中第一个安装的桩,作为后续桩的引导。这一过程至关重要,因为它确保整个基础系统的对齐和正确定位。leading pile的重要性不容小觑,因为它在分配负载和维持上方结构的稳定性方面发挥着至关重要的作用。安装leading pile需要仔细的规划和执行。工程师必须在确定适当的桩类型和尺寸之前评估土壤条件、负载要求和环境因素。一旦leading pile安装完成,它就成为其他桩的基准,后续桩根据它的相对位置打入地下。这种对齐对于确保负载均匀分布在所有桩上至关重要,从而增强了基础的整体强度和耐久性。此外,使用leading pile可以显著降低不均匀沉降的风险,这可能导致长期的结构问题。通过提供一个坚实的参考点,leading pile有助于维护基础的完整性,特别是在具有挑战性的土壤条件下。例如,在松散或不稳定的土壤区域,leading pile可能需要打得更深,以达到更稳定的岩层。这种适应性是工程师优先选择和安装可靠的leading pile的原因之一。除了技术优势之外,leading pile还对项目时间表和成本产生影响。一个放置得当的leading pile可以通过为其余基础工作的清晰框架提供便利,从而简化施工过程。这种效率可以节省时间和金钱,使其成为建筑商和开发商的一个吸引人的选择。此外,leading pile的概念也可以超越物理建设。在比喻意义上,它可以代表在任何项目或事业中拥有坚实基础的重要性。就像leading pile支撑建筑一样,强大的原则和价值观可以引导个人和组织走向成功。在开始时建立明确的愿景和目标可以作为未来决策的leading pile,帮助应对挑战并实现目标。总之,leading pile是建筑和工程领域的基本组成部分。作为基础系统中第一个安装的桩,它在确保对齐、稳定性和负载分配方面发挥着关键作用。理解leading pile的重要性使工程师和建筑商能够创造更安全、更耐用的结构。超越其技术含义,leading pile的理念也可以激励个人在个人和职业生活中建立坚实的基础,引导他们在面对挑战时走向成功和韧性。
相关单词