erection sequence

简明释义

装配顺序

英英释义

The specific order and method by which a structure, such as a building or bridge, is constructed and assembled.

构造或组装建筑物或桥梁等结构的特定顺序和方法。

例句

1.The project manager emphasized the importance of following the erection sequence to avoid delays.

项目经理强调遵循安装顺序的重要性,以避免延误。

2.Understanding the erection sequence is crucial for ensuring safety during construction.

理解安装顺序对确保施工安全至关重要。

3.During the meeting, we discussed the erection sequence for the steel framework.

在会议上,我们讨论了钢框架的安装顺序

4.The engineer provided a detailed report on the erection sequence for the new bridge.

工程师提供了关于新桥的安装顺序的详细报告。

5.A clear erection sequence helps in coordinating the efforts of different teams on site.

清晰的安装顺序有助于协调现场不同团队的工作。

作文

The construction of large structures, such as skyscrapers or bridges, involves a meticulously planned process that ensures safety and efficiency. One of the critical components of this process is the erection sequence, which refers to the specific order in which structural elements are assembled and installed. Understanding the erection sequence is essential for engineers and construction managers as it directly impacts the stability of the structure during the building phase.To begin with, the erection sequence must be designed based on various factors including the weight of materials, the site conditions, and the overall design of the structure. For instance, when constructing a high-rise building, the sequence might start with the foundation, followed by the lower floors, and then moving upwards. This methodical approach prevents excessive loads from being placed on incomplete sections, reducing the risk of structural failure.Moreover, the erection sequence is not only about the order of assembly but also involves coordination among different teams and trades on the construction site. Each team must understand their role in the sequence to ensure that materials are available when needed and that the work progresses smoothly. Any delay in one part of the sequence can lead to significant setbacks, affecting the overall timeline of the project.In addition, safety is a paramount concern during the erection sequence. Construction sites are inherently dangerous, and the risk increases when heavy materials are being lifted and positioned. By following a well-planned erection sequence, teams can minimize hazards and ensure that safety protocols are adhered to at all times. For example, using cranes to lift steel beams requires careful calculation of load limits and the timing of lifts to prevent accidents.Another important aspect of the erection sequence is the incorporation of inspections and quality control measures. As each element is erected, it is crucial to verify that it meets the required specifications and standards. This step is vital for ensuring the integrity of the structure and preventing future issues. Engineers may schedule inspections at various points in the erection sequence to catch any potential problems early on.Furthermore, advancements in technology have significantly influenced modern erection sequences. With the use of Building Information Modeling (BIM) and other digital tools, construction teams can visualize the entire process before it begins. This planning allows for better anticipation of challenges and more efficient resource allocation, ultimately leading to a smoother erection sequence.In conclusion, the erection sequence is a fundamental concept in construction that encompasses the order of assembly, coordination among teams, safety measures, and quality control. A well-thought-out erection sequence not only ensures the structural integrity of buildings but also enhances the efficiency of the construction process. As the industry continues to evolve, understanding and mastering the erection sequence will remain crucial for successful project completion.

大型建筑物的建造,如摩天大楼或桥梁,涉及一个经过精心规划的过程,以确保安全和效率。这个过程中的一个关键组成部分是erection sequence,即结构元素组装和安装的具体顺序。理解erection sequence对工程师和施工经理至关重要,因为它直接影响到建筑阶段的结构稳定性。首先,erection sequence必须根据各种因素设计,包括材料的重量、现场条件以及结构的整体设计。例如,在建造高层建筑时,顺序可能从基础开始,然后是下层楼,再向上移动。这种有条理的方法可以防止过多的负荷施加在未完成的部分上,从而降低结构失效的风险。此外,erection sequence不仅仅是组装的顺序,还涉及到施工现场不同团队和工种之间的协调。每个团队必须了解他们在顺序中的角色,以确保材料在需要时可用,并且工作顺利进行。顺序中任何部分的延误都可能导致重大延误,影响项目的整体时间表。此外,安全是erection sequence中的首要关注点。建筑工地本质上是危险的,当重型材料被提升和定位时,风险会增加。通过遵循经过良好规划的erection sequence,团队可以最大限度地减少危害,并确保始终遵守安全协议。例如,使用起重机提升钢梁需要仔细计算负载限制和提升的时机,以防止事故发生。erection sequence的另一个重要方面是纳入检查和质量控制措施。随着每个元素的竖立,验证其是否符合所需规格和标准至关重要。这一步对于确保结构的完整性和防止未来问题至关重要。工程师可能会在erection sequence的各个点安排检查,以便及早发现潜在问题。此外,技术的进步显著影响了现代的erection sequences。借助建筑信息建模(BIM)和其他数字工具,施工团队可以在开始之前可视化整个过程。这种规划允许更好地预见挑战和更有效地分配资源,最终导致更顺畅的erection sequence。总之,erection sequence是建筑中的一个基本概念,涵盖了组装顺序、团队协调、安全措施和质量控制。经过深思熟虑的erection sequence不仅确保建筑的结构完整性,而且提升了施工过程的效率。随着行业的不断发展,理解和掌握erection sequence仍将对成功完成项目至关重要。