erection schedule
简明释义
安装进度
英英释义
例句
1.Delays in the delivery of steel beams affected the erection schedule significantly.
钢梁的交付延误显著影响了安装计划。
2.An unexpected storm caused a setback in the erection schedule for the new building.
一场意外的风暴导致新建筑的安装计划出现了延误。
3.The construction team reviewed the erection schedule to ensure all materials were ready on site.
施工团队审查了安装计划以确保所有材料都已准备好在现场。
4.We need to update the erection schedule based on the latest project timelines.
我们需要根据最新的项目时间表更新安装计划。
5.The project manager emphasized the importance of adhering to the erection schedule during the weekly meeting.
项目经理在每周会议上强调了遵守安装计划的重要性。
作文
The construction industry is a complex field that requires meticulous planning and coordination. One of the essential components of this planning is the erection schedule, which outlines the timeline for assembling various structural elements of a building or infrastructure project. An erection schedule is crucial because it helps ensure that all components are delivered on time, that the workforce is adequately allocated, and that safety protocols are followed during the assembly process.An erection schedule typically includes specific dates for when different parts of the structure will be erected, such as beams, columns, and trusses. This schedule is not only vital for the construction team but also for other stakeholders involved in the project, including architects, engineers, and clients. By having a clear erection schedule, everyone can stay informed about the progress of the project and anticipate any potential delays.Moreover, a well-structured erection schedule allows for better resource management. For example, if a particular section of a building is scheduled to be erected earlier than others, the necessary materials can be ordered and prepared in advance. This proactive approach minimizes downtime and helps avoid last-minute rushes that can lead to mistakes or accidents on site.In addition to logistical benefits, an erection schedule plays a significant role in ensuring safety on the construction site. By clearly outlining when and how different components will be assembled, workers can adhere to safety protocols more effectively. This is particularly important when dealing with heavy machinery and large structural elements, where even a small oversight can lead to serious accidents.Furthermore, an erection schedule can serve as a communication tool among all parties involved in the project. Regular updates to the schedule can keep everyone aligned and informed about any changes or delays. This transparency fosters collaboration and trust between contractors, subcontractors, and clients, ultimately leading to a more successful project outcome.In summary, the erection schedule is a critical element in the construction process. It not only provides a roadmap for the physical assembly of a structure but also enhances communication, resource management, and safety on the job site. As construction projects become increasingly complex, the importance of a detailed and well-maintained erection schedule cannot be overstated. By prioritizing this aspect of project management, construction teams can improve efficiency, reduce risks, and deliver high-quality results that meet the expectations of clients and stakeholders alike.
建筑行业是一个复杂的领域,需要精心的规划和协调。其中一个重要组成部分就是erection schedule,它概述了建筑或基础设施项目中各种结构元素组装的时间表。erection schedule至关重要,因为它有助于确保所有组件按时交付,劳动力得到合理分配,并且在组装过程中遵循安全协议。erection schedule通常包括结构的不同部分将被竖起的具体日期,例如梁、柱和桁架。这个时间表不仅对施工团队至关重要,对参与项目的其他利益相关者,包括建筑师、工程师和客户也是如此。通过拥有明确的erection schedule,每个人都可以保持对项目进展的了解,并预见任何潜在的延误。此外,一个结构良好的erection schedule有助于更好的资源管理。例如,如果建筑的某一部分计划比其他部分更早竖起,则所需的材料可以提前订购和准备。这种主动的方法最小化了停工时间,并帮助避免可能导致错误或事故的最后时刻的匆忙。除了后勤利益外,erection schedule在确保施工现场安全方面也发挥着重要作用。通过清晰地概述何时以及如何组装不同的组件,工人们可以更有效地遵循安全协议。这在处理重型机械和大型结构元素时尤为重要,因为即使是小的疏忽也可能导致严重的事故。此外,erection schedule还可以作为所有参与项目各方之间的沟通工具。定期更新时间表可以让每个人保持一致,并了解任何变化或延误。这种透明度促进了承包商、分包商和客户之间的合作与信任,最终导致更成功的项目结果。总之,erection schedule是施工过程中的关键元素。它不仅提供了结构物理组装的路线图,还增强了沟通、资源管理和工作现场的安全性。随着建筑项目变得越来越复杂,详细且维护良好的erection schedule的重要性不容小觑。通过优先考虑这一项目管理方面,施工团队可以提高效率,降低风险,并交付满足客户和利益相关者期望的高质量结果。