erection procedure
简明释义
安装程序
英英释义
A systematic method or series of steps followed to construct or assemble a structure, typically involving the positioning and securing of components. | 构建或组装结构的系统方法或步骤,通常涉及组件的定位和固定。 |
例句
1.The engineer explained the erection procedure for the new bridge to the construction team.
工程师向施工团队解释了新桥的竖立程序。
2.Training sessions on the erection procedure will be held next week for all workers.
下周将为所有工人举行关于竖立程序的培训课程。
3.Safety measures must be followed during the erection procedure to prevent accidents.
在竖立程序中必须遵循安全措施以防止事故。
4.The construction manager emphasized the importance of adhering to the erection procedure.
施工经理强调了遵守竖立程序的重要性。
5.Before starting the project, we need to review the erection procedure outlined in the manual.
在开始项目之前,我们需要审查手册中列出的竖立程序。
作文
The term erection procedure refers to the series of steps and processes involved in the construction or assembly of a structure, particularly in the context of buildings, bridges, or other large installations. Understanding the erection procedure is crucial for engineers, architects, and construction workers, as it ensures that structures are built safely and efficiently. In this essay, I will explore the significance of the erection procedure, its various stages, and the importance of adhering to safety regulations during the process.Firstly, the erection procedure typically begins with careful planning and design. Before any physical work can begin, engineers must create detailed blueprints that outline the dimensions, materials, and structural integrity required for the project. This stage not only involves technical drawings but also requires collaboration among various stakeholders, including architects, civil engineers, and construction managers. Effective communication during this phase is essential to ensure that everyone is on the same page regarding the project’s goals and requirements.Once the planning phase is complete, the next step in the erection procedure is site preparation. This involves clearing the land, leveling the ground, and ensuring that the foundation is stable enough to support the future structure. The foundation is one of the most critical aspects of any construction project, as it bears the weight of the entire building. A poorly prepared foundation can lead to significant structural issues down the line, making it imperative to follow the established guidelines meticulously.After the foundation is laid, the actual erection procedure can commence. This stage involves the assembly of various components, such as steel beams, concrete panels, and other materials that make up the structure. Cranes and other heavy machinery are often used to lift and position these elements accurately. It is during this phase that safety becomes paramount. Workers must wear protective gear, and safety protocols must be strictly followed to prevent accidents or injuries on the job site.As the structure begins to take shape, regular inspections are necessary to ensure that the erection procedure is being carried out according to the approved plans. Engineers and safety inspectors will check for compliance with local building codes and regulations. Any deviations from the original plans can lead to costly delays and may compromise the safety of the building. Therefore, maintaining rigorous standards throughout the construction process is essential.Finally, once the main structure is erected, the finishing touches can be applied. This may include installing windows, doors, roofing, and interior fixtures. The final phase of the erection procedure also involves thorough inspections and testing to ensure that everything functions as intended. Once completed, the building can be officially opened and utilized for its intended purpose.In conclusion, the erection procedure is a vital aspect of construction that encompasses several stages, from planning and site preparation to assembly and final inspections. Understanding each part of this process is essential for anyone involved in construction, as it ensures that buildings are safe, durable, and meet the needs of their users. Adhering to safety regulations and maintaining open communication among all parties involved are key components that contribute to the successful completion of any construction project. Ultimately, mastering the erection procedure not only enhances the quality of the work but also protects the lives of those who build and inhabit these structures.
术语erection procedure指的是在构建或组装结构时涉及的一系列步骤和过程,特别是在建筑、桥梁或其他大型设施的背景下。理解erection procedure对于工程师、建筑师和施工工人至关重要,因为它确保了结构的安全和效率。在这篇文章中,我将探讨erection procedure的重要性、其各个阶段以及在此过程中遵守安全规定的重要性。首先,erection procedure通常始于仔细的规划和设计。在任何实际工作开始之前,工程师必须创建详细的蓝图,概述项目所需的尺寸、材料和结构完整性。这一阶段不仅涉及技术图纸,还需要各种利益相关者之间的合作,包括建筑师、土木工程师和施工经理。在这一阶段有效的沟通对于确保每个人在项目目标和要求上保持一致至关重要。一旦规划阶段完成,erection procedure的下一步是现场准备。这涉及清理土地、平整地面,并确保基础足够稳定以支撑未来的结构。基础是任何建设项目中最关键的方面之一,因为它承载着整栋建筑的重量。准备不当的基础可能导致后续重大结构问题,因此严格遵循既定指南至关重要。在基础建立后,实际的erection procedure可以开始。这一阶段涉及组装各种组件,如钢梁、混凝土面板和构成结构的其他材料。通常使用起重机和其他重型机械来准确地提升和定位这些元素。正是在这一阶段,安全变得至关重要。工人必须穿戴保护装备,并且必须严格遵循安全协议,以防止事故或伤害发生在工地上。随着结构开始成型,定期检查是必要的,以确保erection procedure按照批准的计划进行。工程师和安全检查员将检查是否遵循当地建筑规范和规定。任何偏离原计划的情况都可能导致昂贵的延误,并可能危及建筑物的安全。因此,在整个施工过程中维持严格的标准至关重要。最后,一旦主要结构竖立完成,就可以进行最后的修饰。这可能包括安装窗户、门、屋顶和内部固定装置。erection procedure的最终阶段还涉及彻底的检查和测试,以确保一切按预期运行。一旦完成,建筑物可以正式开放并用于其预期目的。总之,erection procedure是建设中的一个重要方面,涵盖了多个阶段,从规划和现场准备到组装和最终检查。理解这一过程的每个部分对于任何参与建设的人来说都是必不可少的,因为它确保建筑物安全、耐用并满足用户的需求。遵守安全规定和维护所有相关方之间的开放沟通是成功完成任何建设项目的关键要素。最终,掌握erection procedure不仅提高了工作的质量,还保护了那些建造和居住在这些结构中的人的生命。