erection cost
简明释义
建造成本
英英释义
例句
1.We must negotiate the erection cost with our suppliers to stay within budget.
我们必须与供应商协商竖立成本以保持在预算之内。
2.The total project budget includes the erection cost of the steel framework.
项目总预算包括钢框架的竖立成本。
3.The contractor provided a detailed breakdown of the erection cost for the building.
承包商提供了建筑物竖立成本的详细分解。
4.Unexpected delays can increase the erection cost significantly.
意外的延误可能会显著增加竖立成本。
5.We need to allocate funds for the erection cost of the new wind turbines.
我们需要为新风力涡轮机的竖立成本分配资金。
作文
In the construction industry, various factors contribute to the overall expenses of a project. One important aspect that often gets overlooked is the erection cost. The term erection cost refers to the expenses associated with assembling and installing structural components of a building or infrastructure. This includes the labor, equipment, and materials necessary to raise the structure to its intended height and ensure that it meets safety standards. Understanding erection cost is crucial for project managers and stakeholders, as it can significantly impact the overall budget and timeline of a construction project.When planning a construction project, one must consider the different phases involved. The initial phase usually involves the design and procurement of materials. Once these materials are on-site, the next step is the actual erection of the structure. During this phase, various costs arise. For instance, cranes and other heavy machinery are often required to lift and position large steel beams or concrete panels. The rental or purchase of these machines contributes significantly to the erection cost.Moreover, labor costs play a vital role in determining the erection cost. Skilled workers, such as ironworkers and crane operators, are essential for the safe and efficient assembly of the structure. Their wages, along with any additional costs related to safety training and insurance, must be factored into the overall expenses. The complexity of the project also affects the labor costs; more intricate designs may require more skilled labor and longer assembly times, leading to higher erection costs.Another factor that influences erection cost is the location of the construction site. If the site is in a remote area, transportation costs for materials and equipment can increase significantly. Additionally, logistical challenges, such as limited access for large trucks or cranes, can lead to delays and increased costs. Weather conditions can also impact the erection process; inclement weather may halt work, leading to further delays and potential increases in erection costs due to extended project timelines.To manage and minimize erection costs, project managers can employ several strategies. First, thorough planning and scheduling can help ensure that all necessary materials and equipment are available when needed. This reduces downtime and keeps the project on track. Second, investing in training for workers can improve efficiency and safety, potentially lowering labor costs in the long run. Finally, utilizing technology, such as Building Information Modeling (BIM), can enhance coordination among different teams and streamline the erection process.In conclusion, understanding erection cost is essential for anyone involved in the construction industry. By considering the various factors that contribute to these costs, project managers can make informed decisions that help keep projects within budget and on schedule. As construction continues to evolve, staying aware of the nuances of costs like erection cost will be crucial for success in this competitive field.
在建筑行业中,许多因素会影响项目的整体费用。其中一个常常被忽视的重要方面是竖立成本。术语竖立成本指的是与建筑或基础设施的结构组件组装和安装相关的费用。这包括将结构提升到预定高度所需的劳动力、设备和材料,以及确保其符合安全标准的费用。理解竖立成本对于项目经理和利益相关者至关重要,因为它可能会显著影响建筑项目的整体预算和时间表。在规划建筑项目时,必须考虑涉及的不同阶段。初始阶段通常涉及设计和材料采购。一旦这些材料到达现场,下一步就是实际的结构竖立。在这个阶段,会产生各种费用。例如,通常需要起重机和其他重型机械来提升和定位大型钢梁或混凝土面板。这些机器的租赁或购买对竖立成本的贡献非常大。此外,劳动力成本在确定竖立成本方面也起着至关重要的作用。熟练工人,例如钢铁工人和起重机操作员,对于安全高效地组装结构至关重要。他们的工资以及与安全培训和保险相关的任何额外费用都必须计入整体开支。项目的复杂性也会影响劳动力成本;更复杂的设计可能需要更多的熟练劳动力和更长的组装时间,从而导致更高的竖立成本。影响竖立成本的另一个因素是建筑工地的位置。如果工地位于偏远地区,材料和设备的运输成本可能会显著增加。此外,后勤挑战,例如大型卡车或起重机的有限通行,可能导致延误并增加成本。天气条件也可能影响竖立过程;恶劣天气可能会停止工作,从而导致进一步的延误,并可能由于项目时间表的延长而增加竖立成本。为了管理和减少竖立成本,项目经理可以采用几种策略。首先,彻底的规划和调度可以确保所有必要的材料和设备在需要时可用。这减少了停工时间,保持项目进展顺利。其次,投资于工人的培训可以提高效率和安全性,从而在长期内降低劳动力成本。最后,利用技术,例如建筑信息建模(BIM),可以增强不同团队之间的协调,简化竖立过程。总之,理解竖立成本对任何参与建筑行业的人来说都是必不可少的。通过考虑影响这些成本的各种因素,项目经理可以做出明智的决策,帮助项目保持在预算和时间表内。随着建筑行业的不断发展,关注像竖立成本这样的成本细微差别,对于在这一竞争激烈的领域取得成功至关重要。