crane load
简明释义
吊车起重量
英英释义
例句
1.The operator miscalculated the crane load, causing a safety hazard at the site.
操作员错误计算了起重机负载,导致现场安全隐患。
2.The construction site requires a maximum crane load of 10 tons to lift the steel beams.
施工现场需要最大起重机负载为10吨,以便提升钢梁。
3.Always check the crane load limits before starting your lifting operations.
在开始吊装作业之前,务必检查起重机负载限制。
4.Each crane load must be properly secured to prevent accidents during transportation.
每个起重机负载必须妥善固定,以防运输过程中发生意外。
5.The project manager specified that no more than 5 tons should be in a single crane load.
项目经理规定单次起重机负载不得超过5吨。
作文
In the world of construction and heavy lifting, understanding the term crane load is essential for safety and efficiency. A crane load refers to the weight that a crane is designed to lift and transport. This concept is not only critical for the operation of cranes but also plays a significant role in planning construction projects. When a crane is used on a job site, it is crucial to know the maximum crane load it can handle to prevent accidents and ensure the integrity of the structure being built.The importance of adhering to the specified crane load cannot be overstated. Overloading a crane can lead to catastrophic failures, causing injuries or even fatalities. For instance, if a crane is rated for a maximum load of 10 tons, attempting to lift 12 tons could result in the crane tipping over or dropping its load. Such incidents highlight the necessity for proper training and understanding of crane operations among workers.Moreover, factors such as wind speed, ground conditions, and the crane's configuration can affect the operational limits of the crane load. Operators must take these variables into account when planning lifts. For example, a crane might be able to lift a certain weight under ideal conditions, but high winds could reduce its lifting capacity significantly. Therefore, it is vital for operators to consult the crane’s load chart, which provides detailed information about how much weight can be safely lifted under various conditions.In addition to safety concerns, understanding crane load is also about efficiency. Construction projects often operate under tight schedules, and delays can be costly. By accurately calculating the required crane load for each lift, project managers can streamline operations and avoid unnecessary downtime. This means that workers can complete tasks more quickly, leading to overall project success.Training and certification programs are available for crane operators to ensure they understand how to calculate and manage crane load. These programs cover topics such as load charts, rigging techniques, and safety protocols. By investing in proper training, companies can minimize risks and enhance productivity on the job site.Furthermore, technology has advanced significantly in the field of crane operations. Modern cranes are equipped with load monitoring systems that provide real-time data about the crane load being lifted. This technology helps operators make informed decisions and reduces the likelihood of overloads. As the construction industry continues to evolve, embracing such innovations will be crucial for maintaining safety standards and improving efficiency.In conclusion, the term crane load encompasses more than just the weight that a crane can lift; it represents a fundamental aspect of construction safety and efficiency. Understanding the limits of a crane load is vital for preventing accidents and ensuring that projects run smoothly. With proper training, adherence to safety protocols, and the use of advanced technology, the construction industry can continue to thrive while prioritizing the well-being of its workers.
在建筑和重型起重的世界中,理解“crane load”这一术语对于安全和效率至关重要。“crane load”是指起重机设计用于提升和运输的重量。这个概念不仅对起重机的操作至关重要,而且在规划建筑项目中也发挥着重要作用。当起重机在工地上使用时,了解其最大“crane load”能力以防止事故并确保正在建造结构的完整性是至关重要的。遵守规定的“crane load”的重要性不容小觑。超载起重机可能导致灾难性的故障,造成伤害甚至死亡。例如,如果一台起重机的额定最大负载为10吨,而试图提升12吨的货物,则可能导致起重机倾覆或掉落其负载。这类事件突显了对工人进行适当培训和理解起重机操作的必要性。此外,风速、地面条件和起重机的配置等因素都会影响“crane load”的操作极限。操作员必须在计划吊装时考虑这些变量。例如,在理想条件下,一台起重机可能能够提升一定重量,但高风速可能会显著降低其提升能力。因此,操作员必须查阅起重机的负载图,该图提供有关在各种条件下可以安全提升多少重量的详细信息。除了安全问题,理解“crane load”也是关于效率。建筑项目通常在紧迫的时间表下运行,延误可能是代价高昂的。通过准确计算每次吊装所需的“crane load”,项目经理可以简化操作,避免不必要的停工。这意味着工人可以更快地完成任务,从而导致整个项目的成功。培训和认证项目可供起重机操作员参加,以确保他们了解如何计算和管理“crane load”。这些项目涵盖诸如负载图、索具技术和安全协议等主题。通过投资于适当的培训,公司可以最小化风险,并提高工地的生产力。此外,起重机操作领域的技术已经显著进步。现代起重机配备了负载监测系统,提供有关正在提升的“crane load”的实时数据。这项技术帮助操作员做出明智的决策,并减少超载的可能性。随着建筑行业的不断发展,拥抱这样的创新对于维护安全标准和提高效率至关重要。总之,“crane load”这一术语不仅仅涵盖起重机可以提升的重量;它代表了建筑安全和效率的一个基本方面。理解“crane load”的极限对于防止事故和确保项目顺利进行至关重要。通过适当的培训、遵守安全协议和利用先进技术,建筑行业可以继续蓬勃发展,同时优先考虑工人的福祉。