commissioning test

简明释义

启用试验

英英释义

A commissioning test is a procedure conducted to verify that a system or component operates according to its design specifications and is ready for operational use.

调试测试是一个程序,用于验证系统或组件是否按照其设计规格运行,并准备好投入使用。

例句

1.Successful commissioning tests 调试测试 are crucial for obtaining regulatory approval.

成功的调试测试commissioning tests对于获得监管批准至关重要。

2.Before the new power plant goes live, it must pass a series of commissioning tests 调试测试 to ensure all systems are operational.

在新电厂投入运行之前,它必须通过一系列的调试测试commissioning tests以确保所有系统正常运行。

3.During the commissioning tests 调试测试, several issues were identified that needed to be resolved before the project could proceed.

调试测试commissioning tests期间,发现了几个问题,需要在项目继续之前解决。

4.The engineers conducted commissioning tests 调试测试 on the HVAC system to verify its efficiency.

工程师对HVAC系统进行了调试测试commissioning tests以验证其效率。

5.The team is responsible for scheduling the commissioning tests 调试测试 after installation is complete.

团队负责在安装完成后安排调试测试commissioning tests

作文

In the realm of engineering and manufacturing, the term commissioning test plays a crucial role in ensuring that systems are functioning as intended. A commissioning test refers to a series of evaluations and trials conducted on equipment or systems before they are officially put into operation. This process is essential for identifying any potential issues and verifying that all components meet the required specifications. Without thorough commissioning tests, organizations may face significant risks, including system failures, safety hazards, and increased operational costs.The importance of commissioning tests cannot be overstated. They serve as a final check to confirm that everything is in order before a system is handed over to the client or end-user. For instance, in the construction of a new building, various systems such as electrical, plumbing, and HVAC must undergo commissioning tests to ensure they operate efficiently and safely. These tests not only assess the performance of individual components but also evaluate how well they work together as a cohesive unit.Moreover, commissioning tests contribute to the overall quality assurance process. By systematically testing each aspect of a system, engineers can detect flaws early in the process, which can save time and money in the long run. Identifying problems during the commissioning test phase allows for timely corrections, reducing the likelihood of costly repairs or modifications after the system is in operation.Another critical aspect of commissioning tests is that they provide documentation and validation of compliance with industry standards and regulations. Many industries have specific guidelines that must be followed to ensure safety and reliability. Conducting commissioning tests provides evidence that these standards have been met, which can be crucial for regulatory approvals and certifications.Furthermore, commissioning tests often involve collaboration among various stakeholders, including engineers, project managers, and clients. This collaboration fosters communication and ensures that everyone involved has a clear understanding of the system’s capabilities and limitations. It also allows for feedback from different perspectives, which can lead to improvements in design and functionality.In conclusion, the process of conducting commissioning tests is vital in the fields of engineering and manufacturing. It not only ensures that systems are ready for operation but also enhances safety, quality, and efficiency. As technology continues to advance, the complexity of systems increases, making the need for rigorous commissioning tests even more critical. Ultimately, investing time and resources into this process pays off by delivering reliable and high-performing systems that meet the needs of users and comply with regulatory standards.

在工程和制造领域,术语调试测试在确保系统按预期运行方面发挥着至关重要的作用。调试测试指的是在设备或系统正式投入使用之前进行的一系列评估和试验。这个过程对于识别潜在问题和验证所有组件是否符合要求规格至关重要。如果没有彻底的调试测试,组织可能面临重大风险,包括系统故障、安全隐患和运营成本增加。调试测试的重要性不容低估。它们作为最终检查,以确认在将系统移交给客户或最终用户之前一切正常。例如,在新建筑的施工中,各种系统,如电气、管道和暖通空调,必须经过调试测试,以确保它们高效且安全地运行。这些测试不仅评估单个组件的性能,还评估它们作为一个整体单元的协同工作效果。此外,调试测试有助于整体质量保证过程。通过系统地测试系统的每个方面,工程师可以在过程中及早发现缺陷,从而节省时间和金钱。识别在调试测试阶段出现的问题,可以及时纠正,减少在系统投入运行后发生昂贵维修或修改的可能性。调试测试的另一个关键方面是,它们提供了合规性与行业标准和法规的文档和验证。许多行业都有特定的指南,必须遵循以确保安全和可靠性。进行调试测试提供了这些标准已得到满足的证据,这对于监管批准和认证至关重要。此外,调试测试通常涉及各利益相关者之间的合作,包括工程师、项目经理和客户。这种合作促进了沟通,并确保所有参与者对系统的能力和局限性有清晰的理解。这也允许从不同的角度获得反馈,从而可能导致设计和功能的改进。总之,进行调试测试的过程在工程和制造领域至关重要。它不仅确保系统准备好投入运行,还增强了安全性、质量和效率。随着技术的不断进步,系统的复杂性增加,使得严格的调试测试的需求变得更加关键。最终,在这一过程中投入时间和资源将带来可靠和高性能的系统,满足用户的需求并符合监管标准。

相关单词

commissioning

commissioning详解:怎么读、什么意思、用法