cutover
简明释义
n. 迅速过渡;树木被砍光的地区
adj. 树木被砍光的
英英释义
单词用法
切换计划 | |
切换日期 | |
切换过程 | |
切换策略 | |
安排切换 | |
执行切换 | |
成功的切换 | |
切换到新系统 |
同义词
过渡 | 向新系统的过渡非常顺利。 | ||
切换 | 我们需要将操作切换到新平台。 | ||
变更 | 变更过程比预期的要长。 | ||
迁移 | 数据迁移是切换过程中的关键步骤。 |
反义词
设置 | 新系统的设置花费的时间比预期要长。 | ||
安装 | The installation process was straightforward and completed on time. | 安装过程很简单,按时完成。 |
例句
1.This article introduces the plan of integration of two network for ShanDong Post information network and cutover and implementation of programs and procedures. in detail.
本文详细介绍了山东邮政信息网两网合一优化改造设计和网络割接方案设计及实施步骤。
2.Those partners can transition to this method as their development completes, and they can even allow for both the new and older forms of authentication until over the cutover is complete.
这些合作伙伴可以在开发完成时过渡到此方法,甚至允许在退役期结束之前同时使用新旧两种形式的身份验证。
3.As you see there are a few database exports and imports during the whole cutover process.
正如您所看到的,在整个转换过程中,有多次的数据库导出和导入。
4.Responsible for IP network technology support ; Such as high-end routers and switches, network cascade transfer, network implementation and network cutover level fault troubleshooting.
负责IP网络的技术支持,如高端路由器及交换机的网络级联调、网络割接实施和网络级故障排错;
5.Without the IDS 9.40 new rename restore feature, you may not able to accomplish this architecture change and reduce your total downtime in a cutover process.
没有IDS 9.40新的重新命名恢复功能,您就可能无法在转换过程中完成此体系结构更改和减少总的停机时间。
6.Hot Cutover and Cold Cutover are combined.
组合了热转换和冷转换。
7.Restore Informix from binary backup taken from Hot and Cold Cutover.
通过从热和冷转换获取的二进制备份恢复Informix。
8.This enabled each business partner to determine a schedule for cutover that made sense for their application and was feasible given his own work load.
这样就使得业务合作伙伴能够确定对其应用程序和自己的工作负载可行的退役计划。
9.This new cutover process is suspected to significantly cut down on total system and database downtime, but there are two concerns.
这个新的转换过程被认为可以显著减少系统和数据库总的停机时间,但是有两点需要考虑。
10.During the cutover, all users were advised to save their work frequently.
在切换期间,所有用户被建议频繁保存他们的工作。
11.We encountered some unexpected issues during the cutover process.
在切换过程中,我们遇到了一些意想不到的问题。
12.The cutover to the new network infrastructure took place over the weekend.
新的网络基础设施的切换是在周末进行的。
13.The IT team scheduled the cutover for the new software system to minimize downtime.
IT团队安排了新软件系统的切换,以尽量减少停机时间。
14.The project manager outlined the steps needed for a successful cutover.
项目经理概述了成功切换所需的步骤。
作文
In the world of technology and telecommunications, the term cutover refers to the process of transitioning from one system or service to another. This transition is often critical, as it involves switching operations from an old infrastructure to a new one, ensuring that there is minimal disruption to services. For example, when a company upgrades its software systems, the cutover phase is crucial for maintaining continuity in business operations. During this phase, careful planning and execution are required to ensure that all data is transferred correctly and that users can seamlessly access the new system without facing significant downtime.The significance of a successful cutover cannot be overstated. A poorly managed cutover can lead to data loss, service interruptions, and ultimately, customer dissatisfaction. Therefore, organizations often conduct extensive testing before the actual cutover to identify potential issues and mitigate risks. This preparation phase includes creating backup systems, running parallel systems, and training staff on the new processes.Moreover, communication plays a vital role during the cutover. Stakeholders must be informed about the timeline and expected changes. Customers should be made aware of any potential impacts on their service, while employees need to understand their roles in the new system. Effective communication helps in managing expectations and reducing anxiety surrounding the transition.In practice, a cutover can involve several steps, including data migration, system configuration, and user training. Data migration is particularly sensitive, as it requires transferring large volumes of information without errors. Organizations often use specialized tools to facilitate this process, ensuring data integrity throughout the transition.Once the data has been migrated, the next step in the cutover process is configuring the new system to meet the organization’s needs. This may involve setting up new software applications, adjusting hardware configurations, and integrating various systems to work together efficiently. The goal is to create a seamless environment where all components operate harmoniously.User training is also a critical aspect of the cutover. Employees must be equipped with the knowledge and skills necessary to navigate the new system effectively. Training sessions can vary in format, from hands-on workshops to online tutorials, depending on the complexity of the new technology. The more prepared users are, the smoother the cutover will be.After the cutover is complete, organizations typically enter a stabilization phase. During this time, they monitor the new system closely for any issues that may arise. It is essential to address problems quickly to prevent them from escalating into larger concerns. Feedback from users is invaluable during this phase, as it can provide insights into how well the new system is functioning and highlight areas for improvement.In conclusion, the cutover process is a fundamental aspect of implementing new technologies in any organization. It requires meticulous planning, effective communication, and thorough training to ensure success. By understanding the importance of a well-executed cutover, organizations can minimize disruptions and enhance their overall operational efficiency, paving the way for future growth and innovation.
在技术和电信领域,术语cutover指的是从一个系统或服务过渡到另一个系统或服务的过程。这一过渡通常至关重要,因为它涉及将操作从旧基础设施切换到新基础设施,确保服务的最小中断。例如,当一家公司升级其软件系统时,cutover阶段对于维护业务运营的连续性至关重要。在这一阶段,需要进行仔细的计划和执行,以确保所有数据正确转移,并且用户可以无缝访问新系统,而不会面临显著的停机时间。成功的cutover的重要性不容小觑。管理不善的cutover可能导致数据丢失、服务中断,最终导致客户的不满。因此,组织通常会在实际cutover之前进行广泛的测试,以识别潜在问题并降低风险。这一准备阶段包括创建备份系统、运行并行系统以及对员工进行新流程的培训。此外,在cutover期间,沟通也起着至关重要的作用。利益相关者必须被告知时间表和预期的变化。客户应该了解对其服务可能产生的影响,而员工需要理解他们在新系统中的角色。有效的沟通有助于管理期望并减少围绕过渡的焦虑。在实践中,cutover可能涉及多个步骤,包括数据迁移、系统配置和用户培训。数据迁移尤为敏感,因为它需要在没有错误的情况下转移大量信息。组织通常使用专业工具来促进这一过程,以确保在过渡过程中数据的完整性。数据迁移完成后,cutover过程的下一步是配置新系统以满足组织的需求。这可能涉及设置新的软件应用程序、调整硬件配置以及集成各种系统以高效协同工作。目标是创建一个无缝的环境,使所有组件和谐地运作。用户培训也是cutover的关键方面。员工必须具备有效导航新系统所需的知识和技能。培训课程的形式可以多种多样,从实践研讨会到在线教程,具体取决于新技术的复杂性。用户准备得越充分,cutover就越顺利。完成cutover后,组织通常进入稳定阶段。在此期间,他们密切监控新系统以发现可能出现的问题。迅速解决问题至关重要,以防止问题升级为更大的担忧。在这一阶段,用户的反馈非常宝贵,因为它可以提供有关新系统运行情况的见解,并突出改进的领域。总之,cutover过程是任何组织实施新技术的基本方面。它需要精心的规划、有效的沟通和全面的培训,以确保成功。通过理解良好执行的cutover的重要性,组织可以最小化干扰,提高整体运营效率,为未来的增长和创新铺平道路。