advance fitting-out

简明释义

预舾装

英英释义

Advance fitting-out refers to the process of preparing and equipping a space or structure with necessary fixtures, fittings, and furnishings before it is completed or before it becomes operational.

提前装修是指在空间或结构完成之前,或在其投入使用之前,准备和装备必要的固定装置、配件和家具的过程。

例句

1.Effective communication among contractors is essential during the advance fitting-out stage.

提前装修阶段,承包商之间的有效沟通至关重要。

2.The architect recommended starting the advance fitting-out earlier to avoid delays in the project timeline.

建筑师建议提前开始提前装修,以避免项目时间表的延误。

3.During the advance fitting-out phase, we will focus on installing all necessary utilities and fixtures.

提前装修阶段,我们将专注于安装所有必要的公用设施和设备。

4.We need to finalize the designs before the advance fitting-out can commence.

提前装修开始之前,我们需要最终确定设计方案。

5.The construction team is scheduled to begin the advance fitting-out process next week to ensure everything is ready for the opening.

施工队计划下周开始进行提前装修流程,以确保一切准备就绪以迎接开业。

作文

In the world of construction and project management, the term advance fitting-out plays a crucial role in ensuring that projects are completed efficiently and to the highest standards. advance fitting-out (提前装修) refers to the process of preparing and equipping a building or space before the final finishes are applied. This can include installing essential utilities, such as plumbing and electrical systems, as well as creating the framework for walls and ceilings. By implementing advance fitting-out, project managers can streamline the construction process and reduce the time needed for the overall project completion.One of the significant advantages of advance fitting-out is that it allows for better planning and coordination among various contractors and subcontractors. When the initial stages of construction are completed with an eye towards future fitting-out, it minimizes the chances of delays and miscommunication. For instance, when electrical wiring is installed early on, it can be seamlessly integrated into the design of the space, allowing for a more cohesive final product.Moreover, advance fitting-out can significantly impact the budget of a project. By addressing fitting-out needs early in the construction phase, companies can avoid costly changes and rework later on. This proactive approach helps in managing resources effectively and ensures that funds are allocated efficiently throughout the project's lifecycle. As a result, clients often find that their projects are completed within budget and on schedule.Another important aspect of advance fitting-out is its contribution to sustainability. By considering the fitting-out requirements at the beginning of a project, builders can select materials and systems that are environmentally friendly and energy-efficient. This foresight not only benefits the environment but also appeals to clients who prioritize sustainability in their projects. In today's world, where environmental concerns are at the forefront, incorporating advance fitting-out practices can enhance a company's reputation and attract more clients.Furthermore, the use of technology in advance fitting-out has revolutionized the construction industry. Building Information Modeling (BIM) and other advanced software tools allow architects and engineers to visualize the fitting-out process before any physical work begins. This technology enables teams to identify potential issues and make necessary adjustments early on, leading to a smoother construction experience. The integration of technology with advance fitting-out not only improves accuracy but also fosters collaboration among all parties involved in the project.In conclusion, advance fitting-out is an essential concept in modern construction that brings numerous benefits, including improved efficiency, cost savings, sustainability, and technological integration. As the industry continues to evolve, embracing advance fitting-out practices will be vital for companies seeking to remain competitive and deliver high-quality projects. Clients can expect a more streamlined process and a final product that meets their expectations when advance fitting-out is prioritized from the outset. Ultimately, understanding and implementing this approach can lead to successful project outcomes and satisfied clients.

在建筑和项目管理的世界中,术语advance fitting-out(提前装修)在确保项目高效完成和达到最高标准方面发挥着至关重要的作用。advance fitting-out指的是在最终装饰应用之前,准备和装备建筑或空间的过程。这可以包括安装基本的公用事业设施,如管道和电气系统,以及创建墙壁和天花板的框架。通过实施advance fitting-out,项目经理可以简化建设过程,减少整体项目完成所需的时间。advance fitting-out的一个重要优势是,它可以改善各个承包商和分包商之间的规划和协调。当施工的初始阶段以未来的装修需求为目标完成时,可以最大限度地减少延误和沟通不畅的可能性。例如,当电线在早期安装时,可以无缝地融入空间的设计,从而实现更具一致性的最终产品。此外,advance fitting-out还会对项目的预算产生重大影响。通过在建设阶段早期解决装修需求,公司可以避免后期昂贵的变更和返工。这种前瞻性的方法有助于有效管理资源,并确保在项目生命周期内资金的合理分配。因此,客户通常会发现他们的项目能够在预算内按时完成。advance fitting-out的另一个重要方面是它对可持续性的贡献。通过在项目开始时考虑装修要求,建筑商可以选择环保和节能的材料和系统。这种前瞻性不仅有利于环境,还吸引那些在项目中优先考虑可持续性的客户。在当今这个环境问题处于前沿的世界中,采用advance fitting-out实践可以提升公司的声誉并吸引更多客户。此外,advance fitting-out中技术的使用已经彻底改变了建筑行业。建筑信息建模(BIM)和其他先进的软件工具使建筑师和工程师能够在任何实际工作开始之前可视化装修过程。这项技术使团队能够提前识别潜在问题并进行必要的调整,从而带来更顺利的建设体验。技术与advance fitting-out的结合不仅提高了准确性,还促进了所有参与项目的各方之间的合作。总之,advance fitting-out是现代建筑中一个至关重要的概念,带来了许多好处,包括提高效率、节省成本、可持续性和技术整合。随着行业的不断发展,拥抱advance fitting-out实践对于希望保持竞争力并交付高质量项目的公司来说将至关重要。当从一开始就优先考虑advance fitting-out时,客户可以期待一个更流畅的过程和一个符合其期望的最终产品。最终,理解和实施这种方法可以导致成功的项目成果和满意的客户。