fitting out basin

简明释义

舣装泊位

英英释义

A fitting out basin is a designated area or dock where ships are equipped and prepared for service, typically involving the installation of necessary equipment, supplies, and final adjustments before departure.

配备池是一个专门的区域或码头,用于装备和准备船只投入服务,通常涉及安装必要的设备、补给和在出发前进行最终调整。

例句

1.In the fitting out basin, workers installed the necessary equipment and fixtures.

装备码头,工人们安装了必要的设备和设施。

2.The ship was taken to the fitting out basin for final preparations before its maiden voyage.

这艘船被带到装备码头进行首次航行前的最后准备。

3.The company specializes in the construction of vessels and has a large fitting out basin at their facility.

该公司专门从事船舶建造,并在其设施内拥有一个大型的装备码头

4.Safety checks are crucial during the time spent in the fitting out basin.

装备码头停留期间,安全检查至关重要。

5.After completion in the fitting out basin, the vessel was ready for sea trials.

装备码头完成后,这艘船准备进行海上试航。

作文

The process of shipbuilding is a fascinating blend of engineering, craftsmanship, and innovation. One of the critical stages in this process is known as the fitting out basin, where a newly constructed vessel is equipped with all the necessary components before it is launched into the water. This stage involves installing various systems, such as electrical wiring, plumbing, and navigation equipment, which are essential for the ship's operation. The fitting out basin serves as a dedicated area where workers can focus on these installations without the distractions of other construction activities.During the fitting out phase, the atmosphere in the fitting out basin is often bustling with activity. Skilled technicians and engineers work diligently to ensure that every detail is meticulously addressed. They check the quality of materials being used and ensure that safety standards are met. The importance of this phase cannot be overstated; the success of a ship’s performance at sea heavily relies on the thoroughness of the fitting out process.Moreover, the fitting out basin is not just a physical space but also represents a significant investment in time and resources. Shipbuilders must allocate sufficient funds and manpower to complete this stage efficiently. Delays or errors during fitting out can lead to costly repercussions, including extended timelines and increased expenses. Therefore, meticulous planning and execution are paramount.In addition to technical installations, the fitting out basin is also where aesthetic elements of the ship are finalized. This includes painting, interior design, and the installation of furnishings. These aspects are crucial for passenger comfort and operational efficiency, especially for commercial vessels. A well-fitted ship not only performs better but also provides a pleasant experience for its crew and passengers.Furthermore, the fitting out basin plays a vital role in testing the ship's systems before it sets sail. Various trials are conducted to ensure that everything operates as intended. For instance, engineers will test the propulsion system, examine the hull integrity, and assess the functionality of safety equipment. These tests are essential to identify potential issues that could arise once the vessel is on the open sea.As the world increasingly focuses on sustainability and environmental responsibility, the fitting out basin has also evolved to accommodate greener technologies. Many modern ships are now being fitted with eco-friendly systems that reduce emissions and conserve energy. This shift not only aligns with global efforts to combat climate change but also reflects the changing demands of consumers who are more environmentally conscious.In conclusion, the fitting out basin is a pivotal component of shipbuilding, encompassing a wide range of activities that prepare a vessel for its journey. From technical installations to aesthetic enhancements, this stage ensures that ships are safe, efficient, and ready for the challenges of the sea. Understanding the significance of the fitting out basin helps us appreciate the complexities involved in maritime engineering and the dedication required to bring a ship to life.

造船过程是工程、工艺和创新的迷人结合。其中一个关键阶段被称为配备盆地,在这个阶段,新建船只在下水前配备所有必要的组件。这个阶段涉及安装各种系统,如电气布线、管道和导航设备,这些都是船只运营所必需的。配备盆地作为一个专用区域,使工人能够专注于这些安装,而不受其他施工活动的干扰。在配备阶段,配备盆地里的气氛通常是忙碌的。熟练的技术人员和工程师们努力工作,确保每一个细节都得到细致处理。他们检查所用材料的质量,并确保满足安全标准。这个阶段的重要性不容低估;船只在海上表现的成功在很大程度上依赖于配备过程的彻底性。此外,配备盆地不仅是一个物理空间,还代表着时间和资源的重要投资。造船商必须分配足够的资金和人力,以高效完成这一阶段。配备过程中的延误或错误可能导致昂贵的后果,包括延长时间表和增加费用。因此,周密的计划和执行至关重要。除了技术安装,配备盆地也是船只美学元素最终确定的地方。这包括涂漆、室内设计和家具的安装。这些方面对于乘客的舒适度和操作效率至关重要,尤其是对于商业船只。装备良好的船只不仅表现更好,而且为其船员和乘客提供愉快的体验。此外,配备盆地在船只出航前测试其系统中也起着重要作用。进行各种试验以确保一切按预期运行。例如,工程师将测试推进系统,检查船体完整性,并评估安全设备的功能。这些测试对于识别船只在开放海域时可能出现的问题至关重要。随着世界越来越关注可持续性和环境责任,配备盆地也在不断演变,以适应更环保的技术。许多现代船只现在配备了减少排放和节能的生态友好系统。这一转变不仅与全球应对气候变化的努力相一致,而且反映了消费者日益关注环境的需求。总之,配备盆地是造船的关键组成部分,涵盖了一系列活动,准备船只开始其旅程。从技术安装到美学增强,这个阶段确保船只安全、高效,并为海上的挑战做好准备。理解配备盆地的重要性有助于我们欣赏海洋工程中涉及的复杂性以及赋予船只生命所需的奉献精神。

相关单词

fitting

fitting详解:怎么读、什么意思、用法

basin

basin详解:怎么读、什么意思、用法