erection site
简明释义
装配场
英英释义
A location or area where a structure, such as a building or monument, is constructed or erected. | 一个建筑物或纪念碑等结构被建造或竖立的地点或区域。 |
例句
1.Heavy machinery was brought to the erection site to lift the steel beams.
重型机械被带到竖立地点以提升钢梁。
2.The weather conditions affected the schedule at the erection site significantly.
天气条件显著影响了竖立地点的进度安排。
3.The engineer conducted an inspection of the erection site before starting the project.
在项目开始之前,工程师对竖立地点进行了检查。
4.The construction team arrived early to prepare the erection site for the new building.
施工队早早到达,以准备新的建筑的竖立地点。
5.Safety measures were implemented at the erection site to protect workers.
在竖立地点实施了安全措施以保护工人。
作文
In the field of construction and architecture, the term erection site refers to the specific location where a structure is being built or assembled. This term encompasses not only the physical location but also the various activities and processes involved in the construction of a building or infrastructure. Understanding the significance of the erection site is crucial for several reasons, including safety, efficiency, and project management. Firstly, the erection site must be assessed for safety before any construction begins. This includes evaluating the land for stability, ensuring that all necessary permits are in place, and identifying potential hazards that could affect workers and equipment. A thorough site assessment helps prevent accidents and ensures compliance with local regulations. For instance, if a site is located near a busy road, measures must be taken to safeguard both workers and pedestrians. Secondly, the efficiency of the construction process heavily depends on the organization of the erection site. Proper planning and layout can significantly reduce delays and enhance productivity. This involves strategically placing materials, tools, and machinery to minimize movement and streamline workflows. When workers can easily access what they need without unnecessary trips across the site, the overall pace of construction increases. Additionally, clear signage and pathways should be established to guide workers and vehicles safely around the erection site. Moreover, effective communication among team members is essential at the erection site. Regular meetings and updates can help ensure that everyone is on the same page regarding project timelines, responsibilities, and any changes that may arise. Utilizing technology, such as mobile applications or project management software, can facilitate real-time communication and document sharing, which is invaluable in keeping the project on track. Furthermore, the erection site plays a vital role in environmental considerations. Construction projects can have significant impacts on the surrounding ecosystem, and it is essential to implement sustainable practices. This may include managing waste, minimizing noise pollution, and protecting local wildlife. By being mindful of these factors at the erection site, companies can contribute to a more sustainable future and improve their public image. In conclusion, the concept of the erection site is multifaceted, encompassing safety, efficiency, communication, and environmental responsibility. Understanding and managing these aspects effectively can lead to successful construction projects that meet deadlines, stay within budget, and adhere to safety standards. As the construction industry continues to evolve, the importance of a well-managed erection site will only grow, making it imperative for professionals to stay informed and adaptable to new challenges and technologies.
在建筑和建筑学领域,术语erection site指的是正在建造或组装结构的特定位置。这个术语不仅包括物理位置,还包括与建筑或基础设施建设相关的各种活动和过程。理解erection site的重要性对于安全、效率和项目管理等多个方面至关重要。首先,在任何施工开始之前,必须对erection site进行安全评估。这包括评估土地的稳定性,确保所有必要的许可证到位,以及识别可能影响工人和设备的潜在危险。全面的现场评估有助于防止事故,并确保遵守当地法规。例如,如果一个工地位于繁忙的道路附近,必须采取措施来保护工人和行人。其次,施工过程的效率在很大程度上取决于erection site的组织。适当的规划和布局可以显著减少延误并提高生产力。这涉及到战略性地放置材料、工具和机械,以最小化移动并简化工作流程。当工人能够轻松访问所需的东西,而不必在工地上走来走去时,整个施工进度就会加快。此外,应建立明确的标志和通道,以安全引导工人和车辆穿过erection site。此外,团队成员之间的有效沟通在erection site上至关重要。定期会议和更新可以确保每个人在项目时间表、责任和可能出现的任何变化方面达成共识。利用技术,如移动应用程序或项目管理软件,可以促进实时沟通和文档共享,这在保持项目进度方面非常宝贵。此外,erection site在环境考虑方面发挥着重要作用。建设项目可能对周围生态系统产生重大影响,因此实施可持续实践至关重要。这可能包括管理废物、最小化噪音污染以及保护当地野生动物。通过在erection site上关注这些因素,公司可以为更可持续的未来做出贡献,并改善其公众形象。总之,erection site的概念是多方面的,涵盖了安全、效率、沟通和环境责任。有效理解和管理这些方面可以导致成功的建筑项目,满足截止日期,保持在预算范围内,并遵守安全标准。随着建筑行业的不断发展,良好管理的erection site的重要性只会增加,这使得专业人士必须保持信息灵通并适应新的挑战和技术。
相关单词