erection scheme
简明释义
装配方案
英英释义
A systematic plan or arrangement for the construction or assembly of a structure, often detailing the steps and processes involved. | 一个用于建筑或组装结构的系统计划或安排,通常详细说明涉及的步骤和过程。 |
例句
1.The architect presented the erection scheme for the new skyscraper during the meeting.
建筑师在会议上展示了新摩天大楼的施工方案。
2.During the site inspection, the engineer reviewed the erection scheme with the crew.
在现场检查期间,工程师与工作人员一起审查了施工方案。
3.The erection scheme includes detailed plans for the sequence of building the structure.
该施工方案包含了建造结构的详细顺序计划。
4.An effective erection scheme can help minimize construction delays and costs.
一个有效的施工方案可以帮助减少施工延误和成本。
5.Before construction begins, we need to finalize the erection scheme to ensure safety.
在施工开始之前,我们需要最终确定施工方案以确保安全。
作文
The term erection scheme refers to a detailed plan or strategy for constructing a building or structure. It encompasses various aspects of the construction process, including design, materials, labor, and timelines. In the field of architecture and civil engineering, an effective erection scheme is crucial for ensuring that a project is completed successfully and efficiently. Without a well-thought-out plan, construction projects can face numerous challenges, such as delays, budget overruns, and safety hazards.When developing an erection scheme, architects and engineers must consider several factors. First, they need to analyze the site where the construction will take place. This includes assessing the soil quality, topography, and environmental impact. Understanding these elements helps in determining the best approach for erecting the structure. Additionally, the erection scheme must comply with local building codes and regulations, which are designed to ensure safety and sustainability.Another critical component of an erection scheme is the selection of materials. The choice of materials not only affects the durability and aesthetics of the building but also its overall cost. For example, using steel may provide strength and longevity, while wood can offer a more traditional look. The erection scheme should outline the types of materials to be used, their sources, and any necessary treatments to enhance their performance.Labor is another essential aspect of an erection scheme. A skilled workforce is vital for executing the construction plan effectively. This involves hiring qualified contractors, subcontractors, and laborers who have experience in the specific type of construction being undertaken. The erection scheme should include a clear timeline for when each phase of the construction will occur, allowing for proper coordination among all parties involved.Safety is paramount in any construction project, and a comprehensive erection scheme must address potential risks. This includes implementing safety protocols and training workers on best practices to prevent accidents and injuries on the job site. Regular inspections and monitoring should also be part of the plan to ensure compliance with safety standards.In conclusion, an erection scheme is a fundamental aspect of any construction project. It serves as a roadmap that guides the entire process from conception to completion. By considering factors such as site analysis, material selection, labor management, and safety protocols, architects and engineers can create a robust plan that minimizes risks and maximizes efficiency. Ultimately, a well-executed erection scheme leads to successful construction outcomes, satisfied clients, and lasting structures that contribute positively to the built environment.
术语erection scheme指的是建筑或结构施工的详细计划或策略。它涵盖了施工过程的各个方面,包括设计、材料、劳动力和时间表。在建筑和土木工程领域,一个有效的erection scheme对于确保项目成功高效地完成至关重要。如果没有深思熟虑的计划,施工项目可能会面临许多挑战,例如延误、预算超支和安全隐患。在制定erection scheme时,建筑师和工程师必须考虑几个因素。首先,他们需要分析施工地点。这包括评估土壤质量、地形和环境影响。理解这些元素有助于确定竖立结构的最佳方法。此外,erection scheme必须遵守当地建筑法规和规定,这些法规旨在确保安全和可持续性。erection scheme的另一个关键组成部分是材料选择。材料的选择不仅影响建筑物的耐久性和美观性,还影响其整体成本。例如,使用钢材可以提供强度和耐久性,而木材则可以提供更传统的外观。erection scheme应概述所用材料的类型、来源以及任何必要的处理以增强其性能。劳动力是erection scheme的另一个重要方面。熟练的劳动力对于有效执行施工计划至关重要。这涉及到雇用合格的承包商、分包商和具有特定施工经验的工人。erection scheme应该包括每个施工阶段何时发生的明确时间表,以便所有相关方能够进行适当协调。安全在任何施工项目中都是至关重要的,全面的erection scheme必须解决潜在风险。这包括实施安全协议并培训工人最佳实践,以防止工作现场的事故和伤害。定期检查和监测也应成为计划的一部分,以确保符合安全标准。总之,erection scheme是任何施工项目的基本方面。它作为一张路线图,指导整个过程从构想到完成。通过考虑现场分析、材料选择、劳动力管理和安全协议等因素,建筑师和工程师可以创建一个稳健的计划,最大限度地减少风险,提高效率。最终,执行良好的erection scheme将导致成功的施工结果、满意的客户以及对建筑环境积极贡献的持久结构。