crane erection

简明释义

起重机安装

英英释义

The process of assembling and installing a crane, typically involving the lifting and positioning of various components to create a fully operational structure.

组装和安装起重机的过程,通常涉及提升和定位各个组件,以创建一个完全可操作的结构。

例句

1.Safety protocols are essential during crane erection to prevent accidents on the construction site.

在施工现场,安全协议在起重机安装过程中至关重要,以防止事故发生。

2.Proper planning is crucial for a successful crane erection operation.

合理的规划对成功的起重机安装作业至关重要。

3.The team completed the crane erection process ahead of schedule, ensuring the project stayed on track.

团队提前完成了起重机安装过程,确保项目按计划进行。

4.The crane erection was delayed due to bad weather conditions.

由于恶劣天气条件,起重机安装被推迟。

5.We hired experts for the crane erection to ensure it meets all safety standards.

我们聘请专家进行起重机安装,以确保符合所有安全标准。

作文

The construction industry is a fascinating field that combines engineering, architecture, and project management. One of the key elements in construction is the use of heavy machinery, particularly cranes. Among the various operations involving cranes, crane erection plays a crucial role. This term refers to the process of assembling and positioning cranes at a construction site to facilitate the lifting of heavy materials and equipment. Understanding crane erection is essential for ensuring safety and efficiency on construction projects.During the initial phases of a construction project, careful planning is required to determine the type of crane needed based on the project’s specific needs. Factors such as the height of the building, the weight of the materials, and the layout of the site must be considered. Once these factors are assessed, the next step involves the actual crane erection process.The crane erection process begins with the transportation of the crane components to the site. These components typically include the base, tower sections, jib, and counterweights. Each part is carefully unloaded and inspected for any damage that may have occurred during transit. Safety is of utmost importance at this stage, as any oversight could lead to accidents later on.After inspection, the crane's base is installed first. This base must be anchored securely to the ground to ensure stability during operation. Once the base is in place, the tower sections are stacked one on top of the other, creating the vertical structure of the crane. Each section is connected using bolts and pins, which must be tightened to the manufacturer's specifications to avoid structural failures.As the tower rises, the jib is attached to the top of the crane. The jib is the horizontal arm that extends out from the crane and is responsible for lifting and moving materials. The final step in the crane erection process involves adding the counterweights, which help balance the crane and prevent it from tipping over when lifting heavy loads.Once the crane is fully erected, it undergoes a series of tests to ensure that it operates correctly and safely. These tests include checking the lifting capacity, the functionality of the controls, and the overall stability of the crane. Only after passing these tests can the crane be put into operation.It is important to note that crane erection is not just a mechanical process; it also requires skilled personnel who are trained in safety protocols and operational procedures. Workers involved in this process must wear appropriate personal protective equipment (PPE) and follow strict safety guidelines to minimize the risk of accidents. Additionally, communication among team members is vital during the erection process to ensure that everyone is aware of their responsibilities and that the operation proceeds smoothly.In conclusion, crane erection is a fundamental aspect of construction that demands careful planning, skilled labor, and a strong emphasis on safety. Understanding this process helps in recognizing the complexities involved in construction projects and the importance of proper crane operation. As construction continues to evolve, the techniques and technologies related to crane erection will also advance, further enhancing the efficiency and safety of building projects worldwide.

建筑行业是一个令人着迷的领域,它结合了工程、建筑和项目管理。在建筑中,重型机械的使用尤其关键,特别是起重机。在与起重机相关的各种操作中,起重机安装扮演着至关重要的角色。这个术语指的是在施工现场组装和定位起重机的过程,以便于提升重物和设备。理解起重机安装对于确保施工项目的安全性和效率至关重要。在施工项目的初始阶段,需要仔细规划,以确定根据项目的具体需求所需的起重机类型。必须考虑建筑的高度、材料的重量和场地的布局等因素。一旦评估完这些因素,下一步就是实际的起重机安装过程。起重机安装过程首先从将起重机组件运输到现场开始。这些组件通常包括底座、塔身部分、吊臂和配重。每个部件都小心卸载并检查在运输过程中是否有任何损坏。在这一阶段,安全至关重要,因为任何疏忽都可能导致后来的事故。检查完成后,首先安装起重机的底座。这个底座必须牢固地锚定在地面上,以确保在操作期间的稳定性。底座就位后,塔身部分一个接一个地堆叠起来,形成起重机的垂直结构。每个部分通过螺栓和销钉连接,必须按照制造商的规格进行紧固,以避免结构故障。随着塔身的升高,吊臂被固定在起重机的顶部。吊臂是从起重机伸出的水平臂,负责提升和移动材料。起重机安装过程的最后一步涉及添加配重,这有助于平衡起重机,防止在提升重负荷时翻倒。一旦起重机完全安装,就会进行一系列测试,以确保其正确和安全地运行。这些测试包括检查提升能力、控制功能以及起重机的整体稳定性。只有在通过这些测试后,起重机才能投入使用。值得注意的是,起重机安装不仅仅是一个机械过程;它还需要经过培训的熟练人员,他们了解安全协议和操作程序。参与该过程的工人必须穿戴适当的个人防护装备(PPE),并遵循严格的安全指南,以尽量减少事故风险。此外,在安装过程中,团队成员之间的沟通至关重要,以确保每个人都了解自己的职责,并使操作顺利进行。总之,起重机安装是建筑的一个基本方面,要求仔细规划、熟练劳动力和对安全的高度重视。理解这一过程有助于认识到建筑项目中涉及的复杂性以及适当的起重机操作的重要性。随着建筑行业的不断发展,与起重机安装相关的技术和技术也将不断进步,从而进一步提高全球建筑项目的效率和安全性。

相关单词

erection

erection详解:怎么读、什么意思、用法