executed works

简明释义

已完成的工程,已完成的工作

英英释义

Executed works refer to the completed tasks or projects that have been carried out according to a specified plan or contract.

已执行的工作是指根据特定计划或合同完成的任务或项目。

例句

1.The client requested a summary of the executed works before making the final payment.

客户在最终付款前要求提供已执行工程的总结。

2.Our team is responsible for documenting all executed works on site.

我们的团队负责记录现场所有的已执行工程

3.The contractor submitted the report detailing the executed works for the project.

承包商提交了项目的已执行工程详细报告。

4.During the inspection, the quality of the executed works was found to be satisfactory.

在检查过程中,发现已执行工程的质量令人满意。

5.The architect reviewed the executed works to ensure compliance with the design specifications.

建筑师审查了已执行工程以确保符合设计规范。

作文

In the field of project management and construction, the term executed works refers to the tasks and activities that have been completed as part of a project. These works are crucial for assessing the progress and success of a project, as they represent the actual physical output that has been achieved. Understanding the concept of executed works is essential for professionals in various industries, including architecture, engineering, and construction, as it allows them to evaluate the effectiveness of their planning and execution processes.When a project begins, it typically starts with a detailed plan that outlines the objectives, timelines, and resources required. As the project progresses, the team will engage in numerous activities that lead to the completion of specific components. Each of these completed components contributes to the overall project and is categorized as executed works. This can include everything from the laying of foundations to the installation of electrical systems, and even the final touches such as painting and landscaping.The importance of tracking executed works cannot be overstated. It provides stakeholders with a clear picture of what has been accomplished at any given point in time. This is particularly vital for project managers who need to report on progress to clients, investors, or regulatory bodies. By documenting executed works, teams can identify areas that may require additional resources or adjustments to ensure that the project stays on track.Moreover, the assessment of executed works plays a significant role in quality control. Each completed task must meet specific standards and specifications outlined in the project plan. If the executed works do not adhere to these standards, it can lead to costly rework and delays. Therefore, regular inspections and evaluations of executed works are necessary to maintain quality and ensure that the project meets the expected outcomes.Financially, executed works also have implications. Many contracts in construction projects are based on milestone payments, which are triggered by the completion of certain executed works. This means that accurate reporting and documentation of these works are essential for cash flow management. If a contractor cannot prove that specific works have been executed, they may face delays in payment, which can impact the overall financial health of the project.In conclusion, the term executed works encapsulates the tangible results of a project’s efforts. It serves as a benchmark for measuring progress, quality, and financial management within a project. By understanding and effectively managing executed works, professionals can enhance their project outcomes and ensure that they deliver on their commitments. Ultimately, the successful execution of works is a testament to the planning, coordination, and collaboration that goes into every project, highlighting the critical nature of this concept in the realms of construction and project management.

在项目管理和建筑领域,术语executed works指的是作为项目一部分已完成的任务和活动。这些工作对于评估项目的进展和成功至关重要,因为它们代表了实际取得的物理成果。理解executed works的概念对于建筑、工程和施工等各个行业的专业人士来说是必不可少的,因为这使他们能够评估其计划和执行过程的有效性。当一个项目开始时,通常会制定一个详细的计划,概述目标、时间表和所需资源。随着项目的推进,团队将参与众多活动,以完成特定组件。每一个已完成的组件都为整体项目做出贡献,并被归类为executed works。这可以包括从基础的铺设到电气系统的安装,甚至是最后的修饰,如油漆和园艺。跟踪executed works的重要性不容小觑。它为利益相关者提供了在任何给定时间内所完成工作的清晰图景。这对于需要向客户、投资者或监管机构报告进展的项目经理尤为重要。通过记录executed works,团队可以识别出可能需要额外资源或调整的领域,以确保项目保持在正轨上。此外,评估executed works在质量控制中也发挥着重要作用。每项完成的任务必须符合项目计划中列出的特定标准和规范。如果executed works未能遵循这些标准,可能会导致昂贵的返工和延误。因此,定期检查和评估executed works是维护质量并确保项目达到预期结果的必要条件。在财务上,executed works也有影响。许多建筑项目中的合同基于里程碑付款,这些付款是由某些executed works的完成触发的。这意味着准确报告和记录这些工作的必要性对于现金流管理至关重要。如果承包商无法证明特定工作已被执行,他们可能会面临付款延迟,这可能影响项目的整体财务健康。总之,术语executed works概括了项目努力的有形成果。它作为衡量项目进展、质量和财务管理的基准。通过理解和有效管理executed works,专业人士可以提升项目成果,确保他们履行承诺。最终,工作的成功执行是对每个项目中规划、协调和协作的证明,突显了这一概念在建筑和项目管理领域的重要性。