erection sequence
简明释义
安装程序
英英释义
The planned order and method in which a structure or component is assembled or constructed. | 构造或组件组装或建造的计划顺序和方法。 |
例句
1.The engineer outlined the erection sequence for the new bridge to ensure safety during construction.
工程师概述了新桥的安装顺序以确保施工期间的安全。
2.Understanding the erection sequence is crucial for minimizing delays in the project timeline.
理解安装顺序对于最小化项目时间表中的延误至关重要。
3.The erection sequence was modified to accommodate unexpected weather conditions.
由于意外的天气条件,安装顺序被修改。
4.Each component of the structure has a designated place in the erection sequence.
结构的每个组件在安装顺序中都有指定的位置。
5.The construction manager reviewed the erection sequence before the team began work.
施工经理在团队开始工作之前审查了安装顺序。
作文
The construction of large structures, such as skyscrapers or bridges, involves a complex process that requires careful planning and execution. One of the critical aspects of this process is the erection sequence, which refers to the specific order in which various components of a structure are assembled and installed. Understanding the erection sequence is essential for ensuring the safety, stability, and efficiency of the construction project.When engineers and architects design a building, they must consider how the erection sequence will affect the overall integrity of the structure. For instance, if heavy steel beams are installed before the supporting columns are in place, it could lead to structural failure. Therefore, the erection sequence is meticulously planned to ensure that each component is installed in a manner that supports the others, thereby distributing weight evenly and maintaining balance.In addition to safety considerations, the erection sequence also impacts the construction timeline and costs. By optimizing the order of assembly, construction teams can minimize delays and reduce the need for additional equipment or labor. For example, if certain components can be prefabricated off-site and then brought to the construction site in the correct erection sequence, it can significantly speed up the process and lower expenses.Moreover, the erection sequence is influenced by various factors, including weather conditions, site accessibility, and the availability of materials. Construction managers must constantly adapt their plans to accommodate these variables while still adhering to the predetermined erection sequence. This flexibility is crucial in the construction industry, where unexpected challenges often arise.Another important aspect of the erection sequence is the coordination among different teams involved in the construction process. For example, the teams responsible for electrical, plumbing, and HVAC systems must work closely with the structural team to ensure that their installations do not interfere with the erection sequence. Effective communication and collaboration among all parties are vital to the successful implementation of the erection sequence.Furthermore, advancements in technology have also transformed how the erection sequence is planned and executed. Building Information Modeling (BIM) software allows engineers and architects to visualize the entire construction process, including the erection sequence. This technology enables teams to identify potential issues before they arise, leading to more efficient and safer construction practices.In conclusion, the erection sequence is a fundamental concept in the construction industry that plays a vital role in the successful completion of any building project. It encompasses the order of assembly, safety considerations, cost implications, and the need for effective communication among various teams. By understanding and mastering the erection sequence, construction professionals can ensure that their projects are completed on time, within budget, and to the highest standards of safety and quality. As the industry continues to evolve, the importance of a well-planned erection sequence will remain a cornerstone of successful construction practices.
大型结构的建设,如摩天大楼或桥梁,涉及一个复杂的过程,需要仔细的规划和执行。这个过程中的一个关键方面是erection sequence,指的是结构各个组成部分组装和安装的具体顺序。理解erection sequence对于确保施工项目的安全、稳定和效率至关重要。当工程师和建筑师设计建筑时,他们必须考虑erection sequence将如何影响结构的整体完整性。例如,如果在支撑柱到位之前安装重型钢梁,可能会导致结构失效。因此,erection sequence被精心规划,以确保每个组件以支持其他组件的方式安装,从而均匀分配重量并保持平衡。除了安全考虑之外,erection sequence还会影响施工时间表和成本。通过优化组装顺序,施工团队可以最小化延误,并减少对额外设备或劳动力的需求。例如,如果某些组件可以在现场外预制,然后按照正确的erection sequence运送到施工现场,这可以显著加快进程并降低开支。此外,erection sequence还受到多种因素的影响,包括天气条件、现场可达性和材料的可用性。施工经理必须不断调整他们的计划,以适应这些变量,同时仍然遵守预定的erection sequence。这种灵活性在建筑行业至关重要,因为意想不到的挑战经常出现。erection sequence的另一个重要方面是参与施工过程的不同团队之间的协调。例如,负责电气、管道和暖通空调系统的团队必须与结构团队紧密合作,以确保他们的安装不会干扰erection sequence。有效的沟通和各方之间的协作对于成功实施erection sequence至关重要。此外,技术的进步也改变了erection sequence的规划和执行方式。建筑信息建模(BIM)软件使工程师和建筑师能够可视化整个施工过程,包括erection sequence。这项技术使团队能够在问题发生之前识别潜在问题,从而导致更高效和更安全的施工实践。总之,erection sequence是建筑行业中的一个基本概念,在任何建筑项目的成功完成中发挥着至关重要的作用。它包含了组装顺序、安全考虑、成本影响以及各团队之间有效沟通的必要性。通过理解和掌握erection sequence,建筑专业人士可以确保他们的项目按时、按预算并达到最高的安全和质量标准。随着行业的不断发展,良好规划的erection sequence的重要性将始终是成功施工实践的基石。